Project intelligenceTDLR TABS2026016999New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Westheimer Parkway Public Safety Enhancements - 2022 - UPIN: 23104MF2UE01 in Houston, TX

20150 Westheimer Pkwy, Houston, TX 77082, Houston, TX, 77082

Opening ~May 2027Review Complete

Westheimer Parkway Public Safety Enhancements - 2022 - UPIN: 23104MF2UE01 is a new construction project at 20150 Westheimer Pkwy, Houston, TX 77082, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2027. The project has an estimated value of $1.6M across about 74,052 sq ft.

Estimated project value
$1.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
74,052 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$21/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 7, 2026401 days across supplied datesMay 13, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    37 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    154 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    210 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Westheimer Parkway Public Safety Enhancements - 2022 - UPIN: 23104MF2UE01

Harris County is building a 10-foot-wide asphalt trail along Westheimer Parkway in the Eldridge and West Oaks areas of Houston. The project, registered with the Texas Department of Licensing and Regulation (TDLR) as Westheimer Parkway Public Safety Enhancements, includes a new signalized intersection with ADA-compliant ramps and associated drainage infrastructure connecting to Freedom Park. The filing lists the address as 20150 Westheimer Pkwy, Houston, TX 77082.

The estimated cost for this new construction is $1,561,018 for a total area of 74,052 sq ft. This places the cost per square foot at $21, which is below the Harris County median of $88 per square foot for similar new construction filings. The total estimated cost is above the county median of $750,000 for this project type.

Project Status and Timeline

TDLR completed plan review in May 2026, and the project status is listed as Review Complete. Construction is scheduled to start in October 2026 and is scheduled to finish in May 2027. This scheduled build window of 210 days is close to the Harris County median of 219 days for new construction projects. The registered accessibility specialist for the project is Robert W Green.

Harris County Engineering Department serves as the design firm of record. The county has six other TDLR-registered projects with this design firm, totaling $3,733,878, including closed projects for Selena Quintanilla Perez / Denver Harbor Park and Sidewalk along N. Eldridge Pkwy. Harris County also owns five other registered projects in the region, such as the Harris County Precision Driving Course in Humble and Hufsmith-Kohrville Road in Tomball.

The project involves public funds and public land. The surrounding area in ZIP code 77082 has a population of about 57,269, with a median household income of $60,510 according to U.S. Census estimates. Nearby businesses include Best Buy, Ross Dress for Less, and Bank of America. The Harris County unemployment rate was 5.2 percent in July 2026, higher than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77082 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Westheimer Parkway Public Safety Enhancements - 2022 - UPIN: 23104MF2UE01 is a New Construction project located at 20150 Westheimer Pkwy, Houston, TX 77082, Houston, TX 77082 in Houston, Texas. The project has an estimated value of $1.6M covering 74,052 sq ft. Harris County is the property owner and Harris County Engineering Department is the design firm of record. The project was registered with TDLR on April 7, 2026.

Frequently Asked Questions

When will construction finish?

The project is scheduled to finish in May 2027, with work starting in October 2026. TDLR completed plan review in May 2026.

What is the total cost of the project?

The estimated cost is $1,561,018. This is above the Harris County median for new construction but below the median cost per square foot.

Who is the owner of the project?

Harris County is the owner of record. The Harris County Engineering Department is the design firm of record.

Where is the project located?

The project is located at 20150 Westheimer Pkwy, Houston, TX 77082, in the Eldridge and West Oaks areas.

Is the trail open to the public?

Construction is scheduled to finish in May 2027. The project is in the review complete status, with construction starting in October 2026.

What is Westheimer Parkway Public Safety Enhancements - 2022 - UPIN: 23104MF2UE01?

Westheimer Parkway Public Safety Enhancements - 2022 - UPIN: 23104MF2UE01 is a new construction project at 20150 Westheimer Pkwy, Houston, TX 77082 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 10-foot-wide asphalt trail along Westheimer Parkway with a new signalized intersection with ADA-compliant ramps, and associated drainage infrastructure connecting to Freedom Park. ?

Is Westheimer Parkway Public Safety Enhancements - 2022 - UPIN: 23104MF2UE01 open in Houston?

Westheimer Parkway Public Safety Enhancements - 2022 - UPIN: 23104MF2UE01 is still under construction in Houston, TX, with an estimated completion of May 2027 according to its TDLR registration.

Where is Westheimer Parkway Public Safety Enhancements - 2022 - UPIN: 23104MF2UE01 located?

Westheimer Parkway Public Safety Enhancements - 2022 - UPIN: 23104MF2UE01 is located at 20150 Westheimer Pkwy, Houston, TX 77082, Houston, TX, 77082, in Harris County.

Who is the owner or developer of Westheimer Parkway Public Safety Enhancements - 2022 - UPIN: 23104MF2UE01?

Harris County is the property owner/developer of record for Westheimer Parkway Public Safety Enhancements - 2022 - UPIN: 23104MF2UE01, per its TDLR project registration.

Who is the architect or design firm for Westheimer Parkway Public Safety Enhancements - 2022 - UPIN: 23104MF2UE01?

Harris County Engineering Department is the design firm of record for Westheimer Parkway Public Safety Enhancements - 2022 - UPIN: 23104MF2UE01, according to its TDLR filing.

How much does Westheimer Parkway Public Safety Enhancements - 2022 - UPIN: 23104MF2UE01 cost and how big is it?

Westheimer Parkway Public Safety Enhancements - 2022 - UPIN: 23104MF2UE01 has an estimated construction value of $1.6M and approximately 74,052 square feet (about $21/sqft), based on its TDLR filing.

Scope of Work

10-foot-wide asphalt trail along Westheimer Parkway with a new signalized intersection with ADA-compliant ramps, and associated drainage infrastructure connecting to Freedom Park. ?

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

20150 Westheimer Pkwy, Houston, TX 77082, Houston, TX, 77082

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77082 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.