Project has been registered with TDLR and is in pre-construction phase
South Main Street Drainage Improvements Project, Phase 2 is a Renovation/Alteration project located at 109 South Main Street, Baytown, TX 77520 in Baytown, Texas. The project has an estimated value of $3.4M covering 350,000 sq ft. City of Baytown is the property owner and Carollo Engineers is the design firm of record. The project was registered with TDLR on January 12, 2023.
Remove and replace a portion of South Main Street to increase the size of the storm sewer below ground (this is the only portion in the public ROW), improve an existing Harris County Flood Control District channel, add a detention basin
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jan 12, 2023
Review Complete
Inspection Complete
Closed