Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
South Mesquite Creek Regional WWTP Peak Flow and Expansion Phase 2.
3500 Lawson Road, Mesquite, TX, 75181
South Mesquite Creek Regional WWTP Peak Flow and Expansion Phase 2. is a new construction project at 3500 Lawson Road, Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $600K across about 3,374 sq ft.
- Estimated project value
- $600K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 3,374 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $178/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
18 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
109 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
314 days after the preceding date shown.
Source: TDLR filing
View source record
📰About South Mesquite Creek Regional WWTP Peak Flow and Expansion Phase 2.
The Training Building at 3500 Lawson Road in Mesquite is a completed new construction project. This 3,374 sq ft metal structure passed its final TDLR accessibility inspection in September 2026, confirming that the construction phase is complete. The building was built for the North Texas Municipal Water District as part of the South Mesquite Creek Regional WWTP Peak Flow and Expansion Phase 2.
The facility features a straightforward layout designed for utility and storage. It includes two storage rooms, with the primary space measuring 3,000 sq ft and a secondary room at 302 sq ft. A 72 sq ft restroom is also part of the interior. The building includes two overhangs, providing additional covered areas adjacent to the main structure.
Project Scope and Cost
The estimated cost for this project was $600,000. This figure places the project below the median estimated cost of $950,000 for new construction filings in Dallas County. The cost per square foot is $178, which is above the county median of $125 per square foot. The scheduled build window was 109 days, significantly shorter than the county median of 243 days for similar projects.
Carollo Engineers served as the design firm of record for the project. The registered accessibility specialist was Kimberly J Goss. The project was registered with TDLR in June 2025, with plan review completed in the same month. Construction began in July 2025, and the filing indicated a completion date of October 2025. The actual final inspection occurred in September 2026, marking the official end of the construction timeline.
The North Texas Municipal Water District has six other TDLR-registered projects, totaling over $62 million. These include facilities in Wylie, Leonard, Plano, and Richardson. The design firm, Carollo Engineers, has one other registered project in Baytown. This project is located in Dallas County, a region with a population of approximately 28,018 in the 75181 ZIP code area.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75181 (Mesquite)
One email per change. Unsubscribe in one click. Privacy.
South Mesquite Creek Regional WWTP Peak Flow and Expansion Phase 2. is a New Construction project located at 3500 Lawson Road, Mesquite, TX 75181 in Mesquite, Texas. The project has an estimated value of $600K covering 3,374 sq ft. North Texas Municipal Water District is the property owner and Carollo Engineers is the design firm of record. The project was registered with TDLR on June 26, 2025.
Frequently Asked Questions
Is the Training Building in Mesquite open?
The construction is complete, as the building passed its final TDLR accessibility inspection in September 2026. The TDLR record confirms the physical structure is finished, but it does not specify the operational status or public access hours for the facility.
Who owns the Training Building at 3500 Lawson Road?
The owner of record is the North Texas Municipal Water District. The building was constructed as part of their South Mesquite Creek Regional WWTP Peak Flow and Expansion Phase 2 project in Mesquite, Texas.
What is the total square footage of the building?
The total square footage is 3,374 sq ft. This includes a 3,000 sq ft storage room, a 302 sq ft storage room, and a 72 sq ft restroom within the metal building structure.
When was the final inspection completed?
The final TDLR accessibility inspection was passed in September 2026. This date marks the completion of the construction process according to the TDLR records for this project in Dallas County.
Who was the design firm for this project?
Carollo Engineers was the design firm of record. They handled the design aspects of the Training Building, which is located at 3500 Lawson Road in Mesquite, Texas.
What is South Mesquite Creek Regional WWTP Peak Flow and Expansion Phase 2.?
South Mesquite Creek Regional WWTP Peak Flow and Expansion Phase 2. is a new construction project at 3500 Lawson Road in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The scope includes one metal building with 2 overhangs. There are 2 storage rooms in the building and a restroom. Storage room 1 is 3000 ft^2 and storage room 2 is 302 ft^2. The restroom is 72 ft^2.
Is South Mesquite Creek Regional WWTP Peak Flow and Expansion Phase 2. open in Mesquite?
Construction on South Mesquite Creek Regional WWTP Peak Flow and Expansion Phase 2. is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.
Where is South Mesquite Creek Regional WWTP Peak Flow and Expansion Phase 2. located?
South Mesquite Creek Regional WWTP Peak Flow and Expansion Phase 2. is located at 3500 Lawson Road, Mesquite, TX, 75181, in Dallas County.
Who is the owner or developer of South Mesquite Creek Regional WWTP Peak Flow and Expansion Phase 2.?
North Texas Municipal Water District is the property owner/developer of record for South Mesquite Creek Regional WWTP Peak Flow and Expansion Phase 2., per its TDLR project registration.
Who is the architect or design firm for South Mesquite Creek Regional WWTP Peak Flow and Expansion Phase 2.?
Carollo Engineers is the design firm of record for South Mesquite Creek Regional WWTP Peak Flow and Expansion Phase 2., according to its TDLR filing.
How much does South Mesquite Creek Regional WWTP Peak Flow and Expansion Phase 2. cost and how big is it?
South Mesquite Creek Regional WWTP Peak Flow and Expansion Phase 2. has an estimated construction value of $600K and approximately 3,374 square feet (about $178/sqft), based on its TDLR filing.
Scope of Work
The scope includes one metal building with 2 overhangs. There are 2 storage rooms in the building and a restroom. Storage room 1 is 3000 ft^2 and storage room 2 is 302 ft^2. The restroom is 72 ft^2.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3500 Lawson Road, Mesquite, TX, 75181
Related Projects
Same Owner
$455.6M totalSame Design Firm
$4.0M totalWatch all construction in 75181 (Mesquite)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Mesquite?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.