Project intelligenceTDLR TABS2026016030New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Leonard Water Treatment Plant - Phase 2

361 County Road 4965, Leonard, TX, 75452

Construction complete · Aug 2026Inspection Complete

Leonard Water Treatment Plant - Phase 2 is a new construction project at 361 County Road 4965, Leonard, in Fannin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $5.0M across about 3,700 sq ft.

Estimated project value
$5.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,700 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.35K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 years
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 6, 2024822 days across supplied datesAug 6, 2026

5 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    689 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    5 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    36 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Leonard Water Treatment Plant - Phase 2

The Engineering Building at 361 County Road 4965 in Leonard, Texas, is a new 3,700 sq ft facility constructed as part of the Leonard Water Treatment Plant - Phase 2 expansion. This project, registered with TDLR in March 2026, has passed its final TDLR accessibility inspection in August 2026, confirming that construction is complete. The building serves as a new office space for the North Texas Municipal Water District, supporting the operational needs of the adjacent water treatment infrastructure.

Developed by the North Texas Municipal Water District and designed by Jacobs Engineering, the project involved new construction of the office building and an expansion of the parking lot. The estimated cost for this work was $5,000,000, resulting in a cost of $1,351 per square foot. This figure is significantly above the median cost per square foot for new construction in Fannin County, which stands at $185. The total project cost also exceeds the county median of $750,000, placing this investment in the top quarter of similar filings in the region.

Project Timeline and Scope

Construction began in May 2024, with a scheduled completion date of May 2026. The actual final inspection occurred in August 2026, reflecting a build window of 730 days. This duration is longer than the median scheduled build window of 208 days for new construction projects in Fannin County. The scope was specifically limited to the office building and parking expansion related to the water treatment plant, rather than the treatment infrastructure itself.

This geographic detail is relevant for construction planning and risk assessment. The project utilizes public funds and public land, consistent with its municipal ownership. The registered accessibility specialist for this filing is Samuel Lamar Crook. The TDLR status is now listed as Inspection Complete, indicating that all required accessibility reviews have been satisfied.

North Texas Municipal Water District has six other TDLR-registered projects totaling $58,312,878, including facilities in Wylie, Plano, Richardson, and Mesquite. Jacobs Engineering, the design firm, has worked on six other registered projects totaling $17,546,522, ranging from airport improvements in Houston to park developments in Austin. The area profile for ZIP code 75452 shows a population of about 4,949 and a median household income of $71,117, according to U.S. Census ACS 2023 five-year estimates. Fannin County unemployment was 4.4 percent in July 2026, higher than a year earlier.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75452 (Leonard)

One email per change. Unsubscribe in one click. Privacy.

Leonard Water Treatment Plant - Phase 2 is a New Construction project located at 361 County Road 4965, Leonard, TX 75452 in Leonard, Texas. The project has an estimated value of $5.0M covering 3,700 sq ft. North Texas Municipal Water District is the property owner and Jacobs Engineering is the design firm of record. The project was registered with TDLR on March 26, 2026.

Frequently Asked Questions

Is the Engineering Building in Leonard complete?

Yes, the project passed its final TDLR accessibility inspection in August 2026. The TDLR status is Inspection Complete, confirming that the construction phase is finished.

Who owns the new office building in Leonard?

The owner of record is the North Texas Municipal Water District. The building is part of the Leonard Water Treatment Plant - Phase 2 expansion project.

How much did the project cost?

The estimated cost for the new construction was $5,000,000. This amounts to $1,351 per square foot for the 3,700 sq ft building.

Who designed the Engineering Building?

Jacobs Engineering is the design firm of record for this project. They are responsible for the architectural and engineering design of the facility.

Is the building in a flood zone?

It is designated as zone X on the FEMA National Flood Hazard Layer.

What is Leonard Water Treatment Plant - Phase 2?

Leonard Water Treatment Plant - Phase 2 is a new construction project at 361 County Road 4965 in Leonard, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New office building and parking lot expansion related to expansion of existing water treatment plant.

Is Leonard Water Treatment Plant - Phase 2 open in Leonard?

Construction on Leonard Water Treatment Plant - Phase 2 is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is Leonard Water Treatment Plant - Phase 2 located?

Leonard Water Treatment Plant - Phase 2 is located at 361 County Road 4965, Leonard, TX, 75452, in Fannin County.

Who is the owner or developer of Leonard Water Treatment Plant - Phase 2?

North Texas Municipal Water District is the property owner/developer of record for Leonard Water Treatment Plant - Phase 2, per its TDLR project registration.

Who is the architect or design firm for Leonard Water Treatment Plant - Phase 2?

Jacobs Engineering is the design firm of record for Leonard Water Treatment Plant - Phase 2, according to its TDLR filing.

How much does Leonard Water Treatment Plant - Phase 2 cost and how big is it?

Leonard Water Treatment Plant - Phase 2 has an estimated construction value of $5.0M and approximately 3,700 square feet (about $1.35K/sqft), based on its TDLR filing.

Scope of Work

New office building and parking lot expansion related to expansion of existing water treatment plant.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

361 County Road 4965, Leonard, TX, 75452

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75452 (Leonard)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.