Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Garth Road Reconstruction Phases A&B in Baytown, TX
6615 Garth Rd, Baytown, TX, 77520
Garth Road Reconstruction Phases A&B is a renovation/alteration project at 6615 Garth Rd, Baytown, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2028. The project has an estimated value of $6.49B across about 871,200 sq ft.
- Estimated project value
- $6.49B
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 871,200 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $7.45K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 10mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
34 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
1,034 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Garth Road Reconstruction Phases A&B
Garth Road Reconstruction Phases A&B is a major infrastructure project in the Highland Farms neighborhood of Baytown. The City of Baytown is the owner of record for this renovation and alteration, which covers 871,200 sq ft of roadway. The estimated cost is $6,488,893,438. The project is registered with TDLR and is in plan review, with completion targeted for April 2028.
Scope and Infrastructure
The filing details a comprehensive upgrade of the road corridor at 6615 Garth Rd, Baytown, TX 77520. The scope includes grading, removals, reinforced concrete pavement, and hot mix asphalt. Additional elements involve lime treated subgrade, a raised median, sidewalks, and drainage improvements. The project also encompasses SW3P, traffic signals, pavement markings, signing, and a shared use path.
Holly Respondek is the registered accessibility specialist on record for this project. The funding source involves public funds, public land, or is a Federally funded roadway project. This classification indicates a lower risk of flooding compared to areas within the designated floodplain.
In Harris County, the median estimated cost for renovation and alteration filings is $250,000. This project’s cost is above the county median for its type, placing it in the top quarter of such filings. The scheduled build window of 1034 days is longer than the county median of 92 days for similar projects. The cost per square foot is $7448, which is above the county median of $80 per sq ft.
The City of Baytown has six other TDLR-registered projects totaling $80,072,000. These include the Baytown Fire Station 2, Wayne Gray Sports Complex, and the Brunson Theater. Other registered projects in the same area include the San Jacinto Marketplace, Rooms To Go, and Pluckers Wing BAR. Businesses already near this site include Academy Sports + Outdoors, Olive Garden Italian Restaurant, and Scottish Inns & Suites Garth Rd.
The local area profile for ZIP 77520 shows a population of about 35,724 and a median household income of $54,249. There are 14,411 housing units in the area, with a median owner-occupied home value of $144,200. The Harris County unemployment rate was 5.4 percent in June 2026, higher than a year earlier. This project represents a significant investment in infrastructure for the Baytown community.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77520 (Baytown)
One email per change. Unsubscribe in one click. Privacy.
Garth Road Reconstruction Phases A&B is a Renovation/Alteration project located at 6615 Garth Rd, Baytown, TX 77520 in Baytown, Texas. The project has an estimated value of $6.49B covering 871,200 sq ft. City of Baytown is the property owner. The project was registered with TDLR on May 28, 2025.
Frequently Asked Questions
Is Garth Road Reconstruction Phases A&B open for traffic?
No, the project is in the plan review phase with construction targeted for April 2028. It is not yet open or operating.
Who is the owner of the Garth Road Reconstruction Phases A&B project?
The City of Baytown is the owner and developer of record for this reconstruction project.
What is the estimated cost of the project?
The estimated cost is $6,488,893,438, covering 871,200 sq ft of roadway work.
When is the project expected to be completed?
The completion date on the filing is April 2028, and the project is targeted for April 2028.
What is Garth Road Reconstruction Phases A&B?
Garth Road Reconstruction Phases A&B is a renovation/alteration project at 6615 Garth Rd in Baytown, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: GRADING, REMOVALS, REINFORCED CONCRETE PAVEMENT, HOT MIX ASPHALT, LIME TREATED SUBGRADE, RAISED MEDIAN, SIDEWALKS, DRAINAGE IMPROVEMENTS, SW3P, SIGNALS, PAVEMENT MARKINGS, SIGNING, SHARED USE PATH
Is Garth Road Reconstruction Phases A&B open in Baytown?
Garth Road Reconstruction Phases A&B is still under construction in Baytown, TX, with an estimated completion of Apr 2028 according to its TDLR registration.
Where is Garth Road Reconstruction Phases A&B located?
Garth Road Reconstruction Phases A&B is located at 6615 Garth Rd, Baytown, TX, 77520, in Harris County.
Who is the owner or developer of Garth Road Reconstruction Phases A&B?
City of Baytown is the property owner/developer of record for Garth Road Reconstruction Phases A&B, per its TDLR project registration.
How much does Garth Road Reconstruction Phases A&B cost and how big is it?
Garth Road Reconstruction Phases A&B has an estimated construction value of $6.49B and approximately 871,200 square feet (about $7.45K/sqft), based on its TDLR filing.
Scope of Work
GRADING, REMOVALS, REINFORCED CONCRETE PAVEMENT, HOT MIX ASPHALT, LIME TREATED SUBGRADE, RAISED MEDIAN, SIDEWALKS, DRAINAGE IMPROVEMENTS, SW3P, SIGNALS, PAVEMENT MARKINGS, SIGNING, SHARED USE PATH
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
6615 Garth Rd, Baytown, TX, 77520
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 77520 (Baytown)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Baytown?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.