Project intelligenceTDLR TABS2027000562Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Neighborhood Street Reconstruction of Lantern Park, Dolphin Harbor, Canvasback Cay & Circle Drive

Lantern Park, Dolphin Harbor, Canvasback Cay & Cir, Baytown, TX, 77523

Opening ~Jan 2028Project Registered

Neighborhood Street Reconstruction of Lantern Park, Dolphin Harbor, Canvasback Cay & Circle Drive is a renovation/alteration project at Lantern Park, Dolphin Harbor, Canvasback Cay & Cir, Baytown, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2028. The project has an estimated value of $140K across about 15,400 sq ft.

Estimated project value
$140K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
15,400 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$9/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 9, 2026480 days across supplied datesJan 2, 2028

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    54 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    426 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Neighborhood Street Reconstruction of Lantern Park, Dolphin Harbor, Canvasback Cay & Circle Drive

The Neighborhood Street Reconstruction of Lantern Park, Dolphin Harbor, Canvasback Cay & Circle Drive is a sidewalk and ramp project in Baytown, Texas. The City of Baytown is the owner of record for this renovation/alteration work, which covers 15,000 square feet of sidewalk and 300 square feet of ramps. The total project size is 15,400 square feet with an estimated cost of $140,000. This equates to $9 per square foot. Construction is scheduled to begin in November 2026 and is targeted for January 2028.

The project was registered with the Texas Department of Licensing and Regulation (TDLR) in September 2026. It is in the plan review stage. Kenneth Otten is the registered accessibility specialist for this filing. This location profile indicates a lower risk of flooding compared to areas within the designated floodplain, a factor often considered in long-term infrastructure planning.

Project Scope and Funding

The scope of work is strictly defined in the TDLR filing as the installation of sidewalks and ramps. This is a renovation/alteration type project, distinguishing it from new construction or major road resurfacing. The project involves public funds and public land, consistent with its ownership by the City of Baytown. The estimated cost of $140,000 is below the Harris County median for similar renovation/alteration filings, which stands at $250,000. The scheduled build window of 426 days is longer than the county median of 92 days for comparable projects.

Local Context

The project is situated in ZIP code 77523, which has a population of approximately 28,411 residents. Census estimates for this area indicate a median household income of $120,839 and a median owner-occupied home value of $340,600. The housing stock in this area is predominantly owner-occupied, with 10,448 housing units recorded. The City of Baytown has six other TDLR-registered projects, including the Baytown Fire Station 2 and Wayne Gray Sports Complex, reflecting a broader municipal infrastructure portfolio. This specific street reconstruction aims to improve pedestrian safety and accessibility in these residential neighborhoods.

The project status is listed as Project Registered, with plan review pending. Construction is not yet underway, as the start date is set for November 2026. The completion date on the filing is January 2028, providing a clear timeline for residents to anticipate potential traffic or access changes during the construction period. The low cost per square foot of $9 suggests a focus on efficient material usage and straightforward installation methods for the sidewalk and ramp components.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77523 (Baytown)

One email per change. Unsubscribe in one click. Privacy.

Neighborhood Street Reconstruction of Lantern Park, Dolphin Harbor, Canvasback Cay & Circle Drive is a Renovation/Alteration project located at Lantern Park, Dolphin Harbor, Canvasback Cay & Cir, Baytown, TX 77523 in Baytown, Texas. The project has an estimated value of $140K covering 15,400 sq ft. City of Baytown is the property owner. The project was registered with TDLR on September 9, 2026.

Frequently Asked Questions

Is the Lantern Park street reconstruction finished?

No, the project is not finished. It is targeted for January 2028. Construction is scheduled to start in November 2026, and plan review is pending.

Who is the owner of this project?

The owner of record is the City of Baytown. The project is registered with the Texas Department of Licensing and Regulation (TDLR) under their accessibility program.

What is the total cost of the project?

The estimated cost is $140,000. This covers 15,000 square feet of sidewalk and 300 square feet of ramps.

When does construction start?

Construction is scheduled to start in November 2026. The project was registered with TDLR in September 2026.

Is the project in a flood zone?

It is located in Zone X, which indicates a lower risk of flooding.

What is Neighborhood Street Reconstruction of Lantern Park, Dolphin Harbor, Canvasback Cay & Circle Drive?

Neighborhood Street Reconstruction of Lantern Park, Dolphin Harbor, Canvasback Cay & Circle Drive is a renovation/alteration project at Lantern Park, Dolphin Harbor, Canvasback Cay & Cir in Baytown, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalk (15000 sf) + ramps (300 sf)

Is Neighborhood Street Reconstruction of Lantern Park, Dolphin Harbor, Canvasback Cay & Circle Drive open in Baytown?

Neighborhood Street Reconstruction of Lantern Park, Dolphin Harbor, Canvasback Cay & Circle Drive is still under construction in Baytown, TX, with an estimated completion of Jan 2028 according to its TDLR registration.

Where is Neighborhood Street Reconstruction of Lantern Park, Dolphin Harbor, Canvasback Cay & Circle Drive located?

Neighborhood Street Reconstruction of Lantern Park, Dolphin Harbor, Canvasback Cay & Circle Drive is located at Lantern Park, Dolphin Harbor, Canvasback Cay & Cir, Baytown, TX, 77523, in Harris County.

Who is the owner or developer of Neighborhood Street Reconstruction of Lantern Park, Dolphin Harbor, Canvasback Cay & Circle Drive?

City of Baytown is the property owner/developer of record for Neighborhood Street Reconstruction of Lantern Park, Dolphin Harbor, Canvasback Cay & Circle Drive, per its TDLR project registration.

How much does Neighborhood Street Reconstruction of Lantern Park, Dolphin Harbor, Canvasback Cay & Circle Drive cost and how big is it?

Neighborhood Street Reconstruction of Lantern Park, Dolphin Harbor, Canvasback Cay & Circle Drive has an estimated construction value of $140K and approximately 15,400 square feet (about $9/sqft), based on its TDLR filing.

Scope of Work

Sidewalk (15000 sf) + ramps (300 sf)

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Lantern Park, Dolphin Harbor, Canvasback Cay & Cir, Baytown, TX, 77523

29.77346, -95.00200