Manny's / Powder Room
Manny's / Powder Room is a renovation/alteration project at 301 W 5th Street, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2026). The project has an estimated value of $2.0M across about 3,700 sq ft.
๐Project Metrics
TDLR #TABS2023011514Inspection Complete
Final inspection completed, awaiting project closure
Manny's / Powder Room is a Renovation/Alteration project located at 301 W 5th Street, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $2.0M covering 3,700 sq ft. Fifth and Lavaca Republic Square Limited Partnership is the property owner and RIOS is the design firm of record. The project was registered with TDLR on February 10, 2023.
โFrequently Asked Questions
What is Manny's / Powder Room?
Manny's / Powder Room is a renovation/alteration project at 301 W 5th Street in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: First generation T.I. of ground floor unit into a restaurant and speakeasy bar.
Is Manny's / Powder Room open in Austin?
Construction on Manny's / Powder Room is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2026. The building is finished and very likely open.
Where is Manny's / Powder Room located?
Manny's / Powder Room is located at 301 W 5th Street, Austin, TX, 78701, in Travis County.
Who is the owner or developer of Manny's / Powder Room?
Fifth and Lavaca Republic Square Limited Partnership is the property owner/developer of record for Manny's / Powder Room, per its TDLR project registration.
Who is the architect or design firm for Manny's / Powder Room?
RIOS is the design firm of record for Manny's / Powder Room, according to its TDLR filing.
How much does Manny's / Powder Room cost and how big is it?
Manny's / Powder Room has an estimated construction value of $2.0M and approximately 3,700 square feet (about $541/sqft), based on its TDLR filing.
๐Scope of Work
First generation T.I. of ground floor unit into a restaurant and speakeasy bar.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 10, 2023
Review Complete
Feb 10, 2023
Inspection Complete
Mar 17, 2026
Closed
1131d
Construction phase
๐Related Projects
๐๏ธSame Design Firm
$77.5M total๐Related City Permits
Building permits found at or near this location
Primary bathroom guest bathroom and powder bathroom renovations including electrical fixtures and flooring throughout the unit. No structural or exterior work is proposed- Suite 5402
TPO overlay over existing metal r-panel roof to include new metal trim gutters and downspouts. Existing auto parts store.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Construct new driveway approach of 12 FT. No sidewalk inspection per plan review.