BI 20-B (CSJ: 0003-08-065)
BI 20-B (CSJ: 0003-08-065) is a new construction project at From: West Interchange To: Pecos River, Pecos, in Reeves County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $14.4M across about 7,125 sq ft.
๐Project Metrics
TDLR #TABS2023022261Project Registered
Project has been registered with TDLR and is in pre-construction phase
BI 20-B (CSJ: 0003-08-065) is a New Construction project located at From: West Interchange To: Pecos River, Pecos, TX 79772 in Pecos, Texas. The project has an estimated value of $14.4M covering 7,125 sq ft. TxDOT District: Odessa is the property owner and Walter P. Moore is the design firm of record. The project was registered with TDLR on June 26, 2023.
โFrequently Asked Questions
What is BI 20-B (CSJ: 0003-08-065)?
BI 20-B (CSJ: 0003-08-065) is a new construction project at From: West Interchange To: Pecos River in Pecos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Rehabilitation of existing road, consisting of pavement milling, seal coat, and overlay.
Is BI 20-B (CSJ: 0003-08-065) open in Pecos?
BI 20-B (CSJ: 0003-08-065) is currently under construction in Pecos, TX. Its current TDLR status is "Project Registered".
Where is BI 20-B (CSJ: 0003-08-065) located?
BI 20-B (CSJ: 0003-08-065) is located at From: West Interchange To: Pecos River, Pecos, TX, 79772, in Reeves County.
Who is the owner or developer of BI 20-B (CSJ: 0003-08-065)?
TxDOT District: Odessa is the property owner/developer of record for BI 20-B (CSJ: 0003-08-065), per its TDLR project registration.
Who is the architect or design firm for BI 20-B (CSJ: 0003-08-065)?
Walter P. Moore is the design firm of record for BI 20-B (CSJ: 0003-08-065), according to its TDLR filing.
How much does BI 20-B (CSJ: 0003-08-065) cost and how big is it?
BI 20-B (CSJ: 0003-08-065) has an estimated construction value of $14.4M and approximately 7,125 square feet (about $2.02K/sqft), based on its TDLR filing.
๐Scope of Work
Rehabilitation of existing road, consisting of pavement milling, seal coat, and overlay.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 26, 2023
Review Complete
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$37.03B totalProperty Owner
Design Firm
Registered Accessibility Specialist
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Reeves County
Find General Contractors in Reeves