Project intelligenceTDLR TABS2025022028New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

SH 158 (CSJ: 0463-02-079, etc.)

At Briarwood Ave / CR 60 Intersection, Midland, TX, 79706

Opening ~Nov 2026Review Complete

SH 158 (CSJ: 0463-02-079, etc.) is a new construction project at At Briarwood Ave / CR 60 Intersection, Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $6.2M across about 560 sq ft.

Estimated project value
$6.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
560 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$11.01K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 25, 2025519 days across supplied datesNov 26, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    195 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    324 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79706 (Midland)

One email per change. Unsubscribe in one click. Privacy.

SH 158 (CSJ: 0463-02-079, etc.) is a New Construction project located at At Briarwood Ave / CR 60 Intersection in Midland, Texas. The project has an estimated value of $6.2M covering 560 sq ft. TxDOT District: Odessa is the property owner and Kimley-Horn is the design firm of record. The project was registered with TDLR on June 25, 2025.

Frequently Asked Questions

What is SH 158 (CSJ: 0463-02-079, etc.)?

SH 158 (CSJ: 0463-02-079, etc.) is a new construction project at At Briarwood Ave / CR 60 Intersection in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Intersection widening including grading, paving, drainage structures, traffic signals, and ADA facilities.

Is SH 158 (CSJ: 0463-02-079, etc.) open in Midland?

SH 158 (CSJ: 0463-02-079, etc.) is still under construction in Midland, TX, with an estimated completion of Nov 2026 according to its TDLR registration.

Where is SH 158 (CSJ: 0463-02-079, etc.) located?

SH 158 (CSJ: 0463-02-079, etc.) is located at At Briarwood Ave / CR 60 Intersection, Midland, TX, 79706, in Midland County.

Who is the owner or developer of SH 158 (CSJ: 0463-02-079, etc.)?

TxDOT District: Odessa is the property owner/developer of record for SH 158 (CSJ: 0463-02-079, etc.), per its TDLR project registration.

Who is the architect or design firm for SH 158 (CSJ: 0463-02-079, etc.)?

Kimley-Horn is the design firm of record for SH 158 (CSJ: 0463-02-079, etc.), according to its TDLR filing.

How much does SH 158 (CSJ: 0463-02-079, etc.) cost and how big is it?

SH 158 (CSJ: 0463-02-079, etc.) has an estimated construction value of $6.2M and approximately 560 square feet (about $11.01K/sqft), based on its TDLR filing.

Scope of Work

Intersection widening including grading, paving, drainage structures, traffic signals, and ADA facilities.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

📍Location & Views

Open in MapsGet Directions|31.83688, -102.01038

Watch all construction in 79706 (Midland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Midland

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists