Apex Systems
Apex Systems is a renovation/alteration project at 11501 Alterra Pkwy Ste. 530, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2024). The project has an estimated value of $100K across about 6,692 sq ft.
๐Project Metrics
TDLR #TABS2024004437Project Closed
Project has been completed and closed
Apex Systems is a Renovation/Alteration project located at 11501 Alterra Pkwy Ste. 530, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $100K covering 6,692 sq ft. Cousins Properties is the property owner and S. Tipton Studio is the design firm of record. The project was registered with TDLR on October 31, 2023.
โFrequently Asked Questions
What is Apex Systems?
Apex Systems is a renovation/alteration project at 11501 Alterra Pkwy Ste. 530 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing office space.
Is Apex Systems open in Austin?
Construction on Apex Systems is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2024. The building is finished and very likely open.
Where is Apex Systems located?
Apex Systems is located at 11501 Alterra Pkwy Ste. 530, Austin, TX, 78758, in Travis County.
Who is the owner or developer of Apex Systems?
Cousins Properties is the property owner/developer of record for Apex Systems, per its TDLR project registration.
Who is the architect or design firm for Apex Systems?
S. Tipton Studio is the design firm of record for Apex Systems, according to its TDLR filing.
How much does Apex Systems cost and how big is it?
Apex Systems has an estimated construction value of $100K and approximately 6,692 square feet (about $15/sqft), based on its TDLR filing.
๐Scope of Work
Remodel of existing office space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 31, 2023
Review Complete
Inspection Complete
Closed
Feb 26, 2024
๐Related Projects
๐คSame Owner
$581.2M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Fidelity Domain South Elevation Signage
Replacement of an existing water heater Installing like/like G Water heater.
New Pool
Interior remodel of existing pizza restaurant to accommodate new pizza restaurant