Nucor is a renovation/alteration project at 700 E SH 121 Bypass Suite 200, Lewisville, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2024). The project has an estimated value of $3.0M across about 57,331 sq ft.
๐Project Metrics
TDLR #TABS2024004828Project Closed
Project has been completed and closed
Nucor is a Renovation/Alteration project located at 700 E SH 121 Bypass Suite 200, Lewisville, TX 75067 in Lewisville, Texas. The project has an estimated value of $3.0M covering 57,331 sq ft. LV Office 1&2, LLC is the property owner and Interprise Design is the design firm of record. The project was registered with TDLR on November 6, 2023.
โFrequently Asked Questions
What is Nucor?
Nucor is a renovation/alteration project at 700 E SH 121 Bypass Suite 200 in Lewisville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Finish-out of existing office space
Is Nucor open in Lewisville?
Construction on Nucor is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2024. The building is finished and very likely open.
Where is Nucor located?
Nucor is located at 700 E SH 121 Bypass Suite 200, Lewisville, TX, 75067, in Denton County.
Who is the owner or developer of Nucor?
LV Office 1&2, LLC is the property owner/developer of record for Nucor, per its TDLR project registration.
Who is the architect or design firm for Nucor?
Interprise Design is the design firm of record for Nucor, according to its TDLR filing.
How much does Nucor cost and how big is it?
Nucor has an estimated construction value of $3.0M and approximately 57,331 square feet (about $52/sqft), based on its TDLR filing.
๐Scope of Work
Interior Finish-out of existing office space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 6, 2023
Review Complete
Inspection Complete
Closed
Apr 30, 2024