Chioco Office
Chioco Office is a renovation/alteration project at 1515 E Cesar Chavez, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2025). The project has an estimated value of $300K across about 3,260 sq ft.
๐Project Metrics
TDLR #TABS2024014603Project Closed
Project has been completed and closed
Chioco Office is a Renovation/Alteration project located at 1515 E Cesar Chavez, Austin, TX 78702 in Austin, Texas. The project has an estimated value of $300K covering 3,260 sq ft. Pennybacker Capital is the property owner and Chioco Design LLC is the design firm of record. The project was registered with TDLR on March 25, 2024.
โFrequently Asked Questions
What is Chioco Office?
Chioco Office is a renovation/alteration project at 1515 E Cesar Chavez in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 3260 tenant office finish out, first gen
Is Chioco Office open in Austin?
Construction on Chioco Office is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2025. The building is finished and very likely open.
Where is Chioco Office located?
Chioco Office is located at 1515 E Cesar Chavez, Austin, TX, 78702, in Travis County.
Who is the owner or developer of Chioco Office?
Pennybacker Capital is the property owner/developer of record for Chioco Office, per its TDLR project registration.
Who is the architect or design firm for Chioco Office?
Chioco Design LLC is the design firm of record for Chioco Office, according to its TDLR filing.
How much does Chioco Office cost and how big is it?
Chioco Office has an estimated construction value of $300K and approximately 3,260 square feet (about $92/sqft), based on its TDLR filing.
๐Scope of Work
3260 tenant office finish out, first gen
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 25, 2024
Review Complete
Inspection Complete
Closed
Mar 1, 2025
๐Related Projects
๐คSame Owner
$30.6M total๐๏ธSame Design Firm
$93.4M total๐Related City Permits
Building permits found at or near this location
The steel yard line is to be replaced. New yard line and hose bibb placed with PEX line penetrating through the wall.
Install Level 2 EV Charger
gas pressure test
Run new water line from the yard under the foundation due to low water pressure connect from PVC to pex material to copper under the foundation. Total length of yard line is about 20 feet.
repair small section of broken gas line