RP07 HE
RP07 HE is a renovation/alteration project at 5300 Riata Vista Circle, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $2.0M across about 6,486 sq ft.
๐Project Metrics
TDLR #TABS2024022162Inspection Complete
Final inspection completed, awaiting project closure
RP07 HE is a Renovation/Alteration project located at 5300 Riata Vista Circle, Austin, TX 78727 in Austin, Texas. The project has an estimated value of $2.0M covering 6,486 sq ft. PARMER TEXAS LLC is the property owner and OZ Architecture is the design firm of record. The project was registered with TDLR on July 1, 2024.
โFrequently Asked Questions
What is RP07 HE?
RP07 HE is a renovation/alteration project at 5300 Riata Vista Circle in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant Improvement
Is RP07 HE open in Austin?
Construction on RP07 HE is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.
Where is RP07 HE located?
RP07 HE is located at 5300 Riata Vista Circle, Austin, TX, 78727, in Travis County.
Who is the owner or developer of RP07 HE?
PARMER TEXAS LLC is the property owner/developer of record for RP07 HE, per its TDLR project registration.
Who is the architect or design firm for RP07 HE?
OZ Architecture is the design firm of record for RP07 HE, according to its TDLR filing.
How much does RP07 HE cost and how big is it?
RP07 HE has an estimated construction value of $2.0M and approximately 6,486 square feet (about $308/sqft), based on its TDLR filing.
๐Scope of Work
Tenant Improvement
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 1, 2024
Review Complete
Jul 1, 2024
Inspection Complete
Aug 4, 2026
Closed
764d
Construction phase
๐Related Projects
๐คSame Owner
$15.3M total๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater Change Out: Install/ Replace 50 gallon electric tank-type water heater.
Replacement of an existing water heater Navien 210A Tankless water Heater Location: Garage
Interior Remodel (Kitchen remodel with plumbing and electrical relocation and underground trenching window and door replacement new exterior sliding glass door) Conversion of an office into a bedroom by constructing a new interior wall and replacing the existing window to meet egress requirements.
Interior Remodel (Kitchen remodel with plumbing and electrical relocation and underground trenching window and door replacement new exterior sliding glass door) Conversion of an office into a bedroom by constructing a new interior wall and replacing the existing window to meet egress requirements.
TPO single ply recover. Remove existing TPO membrane install new 1/2 hd cover board rhino bond new80 mil membrane