Smoothie King
Smoothie King is a renovation/alteration project at 164 Belterra Village Way - Suite Y300, Austin, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $250K across about 1,205 sq ft.
๐Project Metrics
TDLR #TABS2024023141Review Complete
Design review complete, construction may proceed
Smoothie King is a Renovation/Alteration project located at 164 Belterra Village Way - Suite Y300, Austin, TX 78737 in Austin, Texas. The project has an estimated value of $250K covering 1,205 sq ft. Danly Properties is the property owner and The MT Studio, LLC is the design firm of record. The project was registered with TDLR on July 16, 2024.
โFrequently Asked Questions
What is Smoothie King?
Smoothie King is a renovation/alteration project at 164 Belterra Village Way - Suite Y300 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior tenant fit-out of a 1,205 sq ft space to accommodate a Smoothie King. This submittal includes architectural, plumbing, mechanical, and electrical drawings.
Is Smoothie King open in Austin?
Smoothie King is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is Smoothie King located?
Smoothie King is located at 164 Belterra Village Way - Suite Y300, Austin, TX, 78737, in Hays County.
Who is the owner or developer of Smoothie King?
Danly Properties is the property owner/developer of record for Smoothie King, per its TDLR project registration.
Who is the architect or design firm for Smoothie King?
The MT Studio, LLC is the design firm of record for Smoothie King, according to its TDLR filing.
How much does Smoothie King cost and how big is it?
Smoothie King has an estimated construction value of $250K and approximately 1,205 square feet (about $207/sqft), based on its TDLR filing.
๐Scope of Work
Interior tenant fit-out of a 1,205 sq ft space to accommodate a Smoothie King. This submittal includes architectural, plumbing, mechanical, and electrical drawings.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 16, 2024
Review Complete
Jul 16, 2024
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$27.1M total๐Related City Permits
Building permits found at or near this location
ETJ new waste water service for SFR
Gardenhouse Plumbing will be making an access hole on the front of the home to tunnel under the home 5 to fix a broken sewer pipe connected to the main bathrooms bathtub P-Trap.
New construction in-ground pool and spa.
Plumbing for New Construction of SFR in the ETJ 2035 sq ft Wastewater only - 2026-071093 WW Water is provided by Manville.
New Construction Plumbing ETJ 2719 sq. ft.