Final inspection completed, awaiting project closure
Cedar Creek High School Renovations is a Additions to Existing Building project located at 793 Union Chapel Road, Cedar Creek, TX 78612 in Cedar Creek, Texas. The project has an estimated value of $21.5M covering 32,757 sq ft. Bastrop ISD is the property owner and VLK Architects, Inc. is the design firm of record. The project was registered with TDLR on July 24, 2024.
New classroom addition with sky bridge connection, with minor renovation work to existing building and site improvements
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jul 24, 2024
Review Complete
Inspection Complete
Nov 28, 2025
Closed
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing Type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.
Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing Type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.
Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing Type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.
Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing Type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.