Bastrop High School
1614 Chambers Street, Texas, TX, 78602
Bastrop High School is a type 9003 project at 1614 Chambers Street, Texas, in Bastrop County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $43.5M across about 63,460 sq ft.
- Estimated project value
- $43.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 63,460 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $686/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 2mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
46 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
424 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Bastrop High School
Bastrop High School is expanding with a new 2-story Classroom Addition and a Competition Gym Addition at 1614 Chambers Street in Bastrop County. The project encompasses 63,460 sq ft of new construction with an estimated cost of $43,503,510.
VLK Architects, Inc. serves as the design firm of record for this development. The registered accessibility specialist is Stacey L Brewer. The project involves public funds and public land. Bastrop ISD holds six other TDLR-registered projects totaling $110,174,000, including Bastrop Intermediate School and CRCA Genesis High School, both located in Bastrop.
Construction Timeline and Status
The project was registered with TDLR in April 2025, and plan review was completed in the same month. Construction was scheduled to begin in June 2025, with a completion date listed on the filing as July 2026. Although this date has passed, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.
The cost per square foot is computed at $686. This figure is derived from the estimated total cost and the reported square footage. The project represents a significant expansion of the existing school infrastructure, adding substantial classroom and athletic capacity to the Bastrop ISD campus.
Local Context and Area Profile
The site is situated in ZIP code 78602, where the U.S. Census ACS 2023 five-year estimates indicate a population of about 35,786 residents. The median household income in this area is $86,976, and the median owner-occupied home value is $310,300. Housing in this ZIP code is mostly owner-occupied, with 13,485 housing units reported.
Nearby businesses and landmarks include the PAC - Jerry Fay Wilhelm Center for the Performing Arts, the Bastrop ISD Health Center, Erhard Stadium, and the A. A. Erhard House. The Bastrop County unemployment rate was 4 percent in August 2026, which is lower than a year earlier. VLK Architects, Inc. has completed or is working on five other projects totaling $224,703,200, including the Hutto High School No. 2 project in Hutto.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78602
One email per change. Unsubscribe in one click. Privacy.
Bastrop High School is a Type 9003 project located at 1614 Chambers Street in Texas. The project has an estimated value of $43.5M covering 63,460 sq ft. Bastrop ISD is the property owner and VLK Architects, Inc. is the design firm of record. The project was registered with TDLR on April 17, 2025.
Frequently Asked Questions
What is the total cost of the Bastrop High School addition?
The estimated cost for the new classroom and gym addition is $43,503,510. This figure includes the construction of 63,460 sq ft of new space.
Who is the design firm for this project?
VLK Architects, Inc. is the design firm of record. Stacey L Brewer is the registered accessibility specialist listed in the TDLR filing.
Is the construction finished?
The filing lists a completion date of July 2026, but TDLR has not yet recorded a final inspection. Therefore, the final status of the site is not confirmed in the public record.
How much new space is being added?
The project adds 63,460 sq ft of new construction, including a 2-story classroom addition and a competition gym addition.
What is Bastrop High School?
Bastrop High School is a type 9003 project at 1614 Chambers Street in Texas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 2-story Classroom Addition and New Competition Gym Addition
Is Bastrop High School open in Texas?
Bastrop High School was scheduled to finish construction in Jul 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Bastrop High School located?
Bastrop High School is located at 1614 Chambers Street, Texas, TX, 78602, in Bastrop County.
Who is the owner or developer of Bastrop High School?
Bastrop ISD is the property owner/developer of record for Bastrop High School, per its TDLR project registration.
Who is the architect or design firm for Bastrop High School?
VLK Architects, Inc. is the design firm of record for Bastrop High School, according to its TDLR filing.
How much does Bastrop High School cost and how big is it?
Bastrop High School has an estimated construction value of $43.5M and approximately 63,460 square feet (about $686/sqft), based on its TDLR filing.
Scope of Work
New 2-story Classroom Addition and New Competition Gym Addition
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1614 Chambers Street, Texas, TX, 78602
Related Projects
Same Owner
$458.9M totalRelated City Permits
Building permits found at or near this location
Expedited Review - New construction of 2-story duplex [6bed 8bath] with one attached 1-car Garage and one attached 1-car Carport.
Express: Window replacement
CHANGE OF USE MULTI FAMILY TO RESTAURANT includes existing adjacent interior seating area. No construction. Replace expired change of use permit 2020 142766 BP plumbing final was 2020 142766 PP. APH Health Case 179732.
Finish out of existing shell building to create office space storage rooms and restrooms.
Replacement of complete existing central heat and air system with or without duct work
Watch all construction in 78602
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
Keep exploring the area
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.