Pecos High School Fine Arts Replacement
1201 S, Pecos, TX, 79772
Pecos High School Fine Arts Replacement is a new construction project at 1201 S, Pecos, in Reeves County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2027. The project has an estimated value of $57.7M across about 62,369 sq ft.
- Estimated project value
- $57.7M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 62,369 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $925/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 4mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
50 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
836 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Pecos High School Fine Arts Replacement
The Pecos High School Fine Arts Replacement project is a new construction facility spanning 62,369 sq ft at 1201 S Pecos in Reeves County. This substantial addition to the Pecos-Barstow-Toyah ISD campus features an estimated cost of $57,703,200, reflecting a detailed scope of work that includes a full auditorium with fly loft, band hall, choir hall, ensemble room, scene shop, black box theater, and dedicated art classrooms.
VLK Architects, Inc. serves as the design firm of record for this initiative. The project registered with TDLR in June 2025, with plan review completed in the same month. Construction began in July 2025, and the timeline is scheduled to finish in November 2027. This build window of 836 days is longer than the county median of 365 days for similar new construction filings.
Project Scope and Cost Context
The estimated cost of $925 per square foot places this project above the Reeves County median of $258 per square foot for new construction. This premium reflects the specialized nature of the fine arts components, such as the fly loft and black box theater. The total investment is significant within the local market, as the median estimated cost for new construction in the county is $2,482,000, with the middle half of projects ranging from $686,000 to $10,125,000.
Pecos-Barstow-Toyah ISD has several other TDLR-registered projects, including the main Pecos High School building and a field house replacement. The school district’s portfolio includes five other registered projects totaling $185,142,169, indicating a sustained commitment to infrastructure development in the area. VLK Architects, Inc. also has a track record of large-scale projects, including the Hutto High School No. 2 development valued at $145,000,000.
The project involves public funds and public land, ensuring transparency in its financial structure. William T Winning is the registered accessibility specialist for the filing. The local area, defined by ZIP code 79772, has a population of about 12,547 and a median household income of $56,541, according to U.S. Census ACS 2023 five-year estimates. Housing in this area is predominantly owner-occupied, with a median owner-occupied home value of $116,000.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79772 (Pecos)
One email per change. Unsubscribe in one click. Privacy.
Pecos High School Fine Arts Replacement is a New Construction project located at 1201 S Pecos in Pecos, Texas. The project has an estimated value of $57.7M covering 62,369 sq ft. Pecos-Barstow-Toyah ISD is the property owner and VLK Architects, Inc. is the design firm of record. The project was registered with TDLR on June 2, 2025.
Frequently Asked Questions
When is the Pecos High School Fine Arts Replacement scheduled to finish?
The project is scheduled to finish in November 2027. Construction started in July 2025, following the completion of plan review in June 2025.
What is the total estimated cost of the new Fine Arts facility?
The estimated cost for the 62,369 sq ft facility is $57,703,200. This breaks down to approximately $925 per square foot, which is above the county median for new construction.
Who is the design firm for this project?
VLK Architects, Inc. is the design firm of record. They are responsible for the architectural plans of the new Fine Arts facility, which includes an auditorium and black box theater.
Is the Pecos High School Fine Arts Replacement currently open to the public?
No, the facility is under construction. The TDLR record indicates that construction started in July 2025 and is scheduled to finish in November 2027, so it is not yet operational.
What specific rooms are included in the new Fine Arts building?
The scope includes an Auditorium with a full Fly Loft, Band Hall, Choir Hall, Ensemble room, Scene Shop, Black Box theater, and Art Classrooms.
What is Pecos High School Fine Arts Replacement?
Pecos High School Fine Arts Replacement is a new construction project at 1201 S in Pecos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacement of Fine Arts facility that includes Auditorium with full Fly Loft, Band Hall, Choir Hall, Ensemble, Scene Shop, Black Box, and Art Classrooms
Is Pecos High School Fine Arts Replacement open in Pecos?
Pecos High School Fine Arts Replacement is still under construction in Pecos, TX, with an estimated completion of Nov 2027 according to its TDLR registration.
Where is Pecos High School Fine Arts Replacement located?
Pecos High School Fine Arts Replacement is located at 1201 S, Pecos, TX, 79772, in Reeves County.
Who is the owner or developer of Pecos High School Fine Arts Replacement?
Pecos-Barstow-Toyah ISD is the property owner/developer of record for Pecos High School Fine Arts Replacement, per its TDLR project registration.
Who is the architect or design firm for Pecos High School Fine Arts Replacement?
VLK Architects, Inc. is the design firm of record for Pecos High School Fine Arts Replacement, according to its TDLR filing.
How much does Pecos High School Fine Arts Replacement cost and how big is it?
Pecos High School Fine Arts Replacement has an estimated construction value of $57.7M and approximately 62,369 square feet (about $925/sqft), based on its TDLR filing.
Scope of Work
Replacement of Fine Arts facility that includes Auditorium with full Fly Loft, Band Hall, Choir Hall, Ensemble, Scene Shop, Black Box, and Art Classrooms
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1201 S, Pecos, TX, 79772
Related Projects
Same Owner
$508.1M totalNearby Projects
Within 0.6 miWatch all construction in 79772 (Pecos)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Pecos?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.