Japhet ES - Expansive Soil Repairs Phase 2
Japhet ES - Expansive Soil Repairs Phase 2 is a renovation/alteration project at 314 Astor St., San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2026). The project has an estimated value of $337K across about 8,276 sq ft.
๐Project Metrics
TDLR #TABS2025000389Inspection Complete
Final inspection completed, awaiting project closure
Japhet ES - Expansive Soil Repairs Phase 2 is a Renovation/Alteration project located at 314 Astor St., San Antonio, TX 78210 in San Antonio, Texas. The project has an estimated value of $337K covering 8,276 sq ft. San Antonio ISD is the property owner and MTR Engineers is the design firm of record. The project was registered with TDLR on September 6, 2024.
โFrequently Asked Questions
What is Japhet ES - Expansive Soil Repairs Phase 2?
Japhet ES - Expansive Soil Repairs Phase 2 is a renovation/alteration project at 314 Astor St. in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Expansive soil repairs, drainage improvements, removing and replacing existing asphalt pavement and sidewalk/flat work.
Is Japhet ES - Expansive Soil Repairs Phase 2 open in San Antonio?
Construction on Japhet ES - Expansive Soil Repairs Phase 2 is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2026. The building is finished and very likely open.
Where is Japhet ES - Expansive Soil Repairs Phase 2 located?
Japhet ES - Expansive Soil Repairs Phase 2 is located at 314 Astor St., San Antonio, TX, 78210, in Bexar County.
Who is the owner or developer of Japhet ES - Expansive Soil Repairs Phase 2?
San Antonio ISD is the property owner/developer of record for Japhet ES - Expansive Soil Repairs Phase 2, per its TDLR project registration.
Who is the architect or design firm for Japhet ES - Expansive Soil Repairs Phase 2?
MTR Engineers is the design firm of record for Japhet ES - Expansive Soil Repairs Phase 2, according to its TDLR filing.
How much does Japhet ES - Expansive Soil Repairs Phase 2 cost and how big is it?
Japhet ES - Expansive Soil Repairs Phase 2 has an estimated construction value of $337K and approximately 8,276 square feet (about $41/sqft), based on its TDLR filing.
๐Scope of Work
Expansive soil repairs, drainage improvements, removing and replacing existing asphalt pavement and sidewalk/flat work.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 6, 2024
Review Complete
Sep 6, 2024
Inspection Complete
Mar 30, 2026
Closed
570d
Construction phase