MRI Equipment Replacement
MRI Equipment Replacement is a renovation/alteration project at 1040 West Jefferson Street, Brownsville, in Cameron County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $2.3M across about 1,799 sq ft.
๐Project Metrics
TDLR #TABS2025000493Project Closed
Project has been completed and closed
MRI Equipment Replacement is a Renovation/Alteration project located at 1040 West Jefferson Street, Brownsville, TX 78520 in Brownsville, Texas. The project has an estimated value of $2.3M covering 1,799 sq ft. Tenet Healthcare is the property owner and SBL Architecture, Inc. is the design firm of record. The project was registered with TDLR on September 9, 2024.
โFrequently Asked Questions
What is MRI Equipment Replacement?
MRI Equipment Replacement is a renovation/alteration project at 1040 West Jefferson Street in Brownsville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace the existing MRI equipment & re-work the adjacent rooms to meet the 2024 ACR Manual on MR safety required flow from zones 1 through 4. Mechanical/electrical engineering to address heat & power loads / new layout.
Is MRI Equipment Replacement open in Brownsville?
Construction on MRI Equipment Replacement is complete โ TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
Where is MRI Equipment Replacement located?
MRI Equipment Replacement is located at 1040 West Jefferson Street, Brownsville, TX, 78520, in Cameron County.
Who is the owner or developer of MRI Equipment Replacement?
Tenet Healthcare is the property owner/developer of record for MRI Equipment Replacement, per its TDLR project registration.
Who is the architect or design firm for MRI Equipment Replacement?
SBL Architecture, Inc. is the design firm of record for MRI Equipment Replacement, according to its TDLR filing.
How much does MRI Equipment Replacement cost and how big is it?
MRI Equipment Replacement has an estimated construction value of $2.3M and approximately 1,799 square feet (about $1.28K/sqft), based on its TDLR filing.
๐Scope of Work
Replace the existing MRI equipment & re-work the adjacent rooms to meet the 2024 ACR Manual on MR safety required flow from zones 1 through 4. Mechanical/electrical engineering to address heat & power loads / new layout.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 9, 2024
Review Complete
Sep 9, 2024
Inspection Complete
Closed
May 22, 2026