Leander High School Modernization Phase 1C is a renovation/alteration project at 3301 South Bagdad Rd., Leander, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2026. The project has an estimated value of $29.0M across about 63,500 sq ft.
Design review complete, construction may proceed
Leander High School Modernization Phase 1C is a Renovation/Alteration project located at 3301 South Bagdad Rd., Leander, TX 78641 in Leander, Texas. The project has an estimated value of $29.0M covering 63,500 sq ft. Leander ISD is the property owner and Pfluger Architects is the design firm of record. The project was registered with TDLR on September 12, 2024.
Leander High School Modernization Phase 1C is a renovation/alteration project at 3301 South Bagdad Rd. in Leander, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of athletic restrooms, lockers, offices
Leander High School Modernization Phase 1C is still under construction in Leander, TX, with an estimated completion of Aug 2026 according to its TDLR registration.
Leander High School Modernization Phase 1C is located at 3301 South Bagdad Rd., Leander, TX, 78641, in Williamson County.
Leander ISD is the property owner/developer of record for Leander High School Modernization Phase 1C, per its TDLR project registration.
Pfluger Architects is the design firm of record for Leander High School Modernization Phase 1C, according to its TDLR filing.
Leander High School Modernization Phase 1C has an estimated construction value of $29.0M and approximately 63,500 square feet (about $457/sqft), based on its TDLR filing.
Interior remodel of athletic restrooms, lockers, offices
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 12, 2024
Review Complete
Sep 12, 2024
Inspection Complete
Closed
Building permits found at or near this location
Interior Remodel - no increase in square footage. The project will include new sheathing exterior insulation and rainscreen cladding. The project will also be adding slab edge insulation additional rafters for added insulation and exterior top side roof insulation. The home will be all electric. Existing gas line will be abandoned at the street. Also to include: detaching the garage efficient windows and doors new high efficiency mechanical systems all new plumbing and electrical new landscape pavers new wood deck prewire for future solar. All expired permits will be resolved as part of this renovation
Prewire for Solar
Prewire for Solar
T18 - Replace entry deck with a new composite deck. Foot print will not change. Add deck around pool. Pool done by other contractor.
Set up electrical power50amps for portable hot tub