Leander High School Modernization Phase 1C
๐Project Metrics
TDLR #TABS2025000923Review Complete
Design review complete, construction may proceed
๐Scope of Work
Interior remodel of athletic restrooms, lockers, offices
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$100.0M total๐Related City Permits
Building permits found at or near this location
Installation of 30.600 DC ground mounted solar system with 2 tesla powerwall 3s (1608 sqft)
Installation of 30.600 DC ground mounted solar system with 2 tesla powerwall 3s (1608 sqft)
Installation of 30.600 DC ground mounted solar system with 2 tesla powerwall 3s (1608 sqft)
New inground swimming pool w/ reqd enclosure device for existing 2-story single family residence.
New inground swimming pool w/ reqd enclosure device for existing 2-story single family residence.