Project intelligenceTDLR TABS2026014439Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Hilltop ES Capital Bond Improvements

1050 Harrison Ln, Argyle, TX, 76226

Target date passed (Aug 2026)Review Complete

Hilltop ES Capital Bond Improvements is a renovation/alteration project at 1050 Harrison Ln, Argyle, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.0M across about 80,000 sq ft.

Estimated project value
$2.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
80,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$25/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 8, 2026165 days across supplied datesAug 20, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    40 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    26 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    99 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Hilltop ES Capital Bond Improvements

Hilltop Elementary School in Argyle is undergoing a $2,000,000 renovation that covers 80,000 square feet of the campus at 1050 Harrison Ln. The project, filed as Hilltop ES Capital Bond Improvements, focuses on exterior sitework, ceiling replacements, and repair of the dumpster and retaining wall to enhance safety. Argyle ISD is the owner of record, with Pfluger Architects serving as the design firm.

The work is classified as a renovation/alteration involving public funds and public land. TDLR completed the plan review in April 2026, and construction was scheduled to begin in May 2026 with a target completion date of August 2026. The registered accessibility specialist for this filing is Ross A Thomas. Although the scheduled completion date has passed, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.

Project Scale and Cost Context

At $2,000,000, this project’s estimated cost is above the county median for similar renovation filings in Denton County. The median estimated cost for the 5264 comparable TDLR-registered filings is $235,000, with the middle half ranging from $125,000 to $560,250. The median size for these projects is 3,382 square feet, making Hilltop Elementary significantly larger. The median cost per square foot in this comparison group is $80, whereas this project’s computed rate is $25 per square foot, which is below that median.

The scheduled build window of 99 days is close to the county median of 92 days for similar projects. Argyle ISD has four other TDLR-registered projects totaling $41,300,000, including work at Argyle Middle School and Argyle Elementary School #2. Pfluger Architects, the design firm, has six other registered projects totaling $146,691,268, ranging from Leander High School to Langner Hall in Seguin.

Local Area and Labor Market

Argyle is located in Denton County, which had an unemployment rate of 4.3 percent in July 2026, higher than a year earlier. Census estimates for the 76226 ZIP code indicate a population of about 40,516, with a median household income of $170,530. The median owner-occupied home value is $554,900, and housing is predominantly owner-occupied. These figures provide context for the community where the school improvements are taking place.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76226 (Argyle)

One email per change. Unsubscribe in one click. Privacy.

Hilltop ES Capital Bond Improvements is a Renovation/Alteration project located at 1050 Harrison Ln, Argyle, TX 76226 in Argyle, Texas. The project has an estimated value of $2.0M covering 80,000 sq ft. ARGYLE ISD is the property owner and Pfluger Architects is the design firm of record. The project was registered with TDLR on March 8, 2026.

Frequently Asked Questions

Is Hilltop Elementary School open?

The TDLR record shows construction was scheduled to finish in August 2026, but TDLR has not yet recorded a final inspection. This confirms the construction status, not whether the school is open to the public.

Who is the design firm for this project?

Pfluger Architects is the design firm of record for the Hilltop ES Capital Bond Improvements project.

What work is included in the scope?

The scope includes exterior sitework improvements for safety, ceiling replacements, and repair of the dumpster and retaining wall.

What is Hilltop ES Capital Bond Improvements?

Hilltop ES Capital Bond Improvements is a renovation/alteration project at 1050 Harrison Ln in Argyle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Exterior sitework improvements for safety, ceiling replacements, Dumpster and retaining wall repair

Is Hilltop ES Capital Bond Improvements open in Argyle?

Hilltop ES Capital Bond Improvements was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Hilltop ES Capital Bond Improvements located?

Hilltop ES Capital Bond Improvements is located at 1050 Harrison Ln, Argyle, TX, 76226, in Denton County.

Who is the owner or developer of Hilltop ES Capital Bond Improvements?

ARGYLE ISD is the property owner/developer of record for Hilltop ES Capital Bond Improvements, per its TDLR project registration.

Who is the architect or design firm for Hilltop ES Capital Bond Improvements?

Pfluger Architects is the design firm of record for Hilltop ES Capital Bond Improvements, according to its TDLR filing.

How much does Hilltop ES Capital Bond Improvements cost and how big is it?

Hilltop ES Capital Bond Improvements has an estimated construction value of $2.0M and approximately 80,000 square feet (about $25/sqft), based on its TDLR filing.

Scope of Work

Exterior sitework improvements for safety, ceiling replacements, Dumpster and retaining wall repair

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1050 Harrison Ln, Argyle, TX, 76226

Location by street address

Watch all construction in 76226 (Argyle)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.