Arwa Coffee
Arwa Coffee is a renovation/alteration project at 12301 West Parmer Lane, Cedar Park, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $150K across about 1,900 sq ft.
๐Project Metrics
TDLR #TABS2025001732Review Complete
Design review complete, construction may proceed
Arwa Coffee is a Renovation/Alteration project located at 12301 West Parmer Lane, Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $150K covering 1,900 sq ft. HI Group LLC is the property owner and BA Design Studio is the design firm of record. The project was registered with TDLR on September 24, 2024.
โFrequently Asked Questions
What is Arwa Coffee?
Arwa Coffee is a renovation/alteration project at 12301 West Parmer Lane in Cedar Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Arwa coffee ia a cafe that sell Arabic coffee
Is Arwa Coffee open in Cedar Park?
Arwa Coffee is currently under construction in Cedar Park, TX. Its current TDLR status is "Review Complete".
Where is Arwa Coffee located?
Arwa Coffee is located at 12301 West Parmer Lane, Cedar Park, TX, 78613, in Williamson County.
Who is the owner or developer of Arwa Coffee?
HI Group LLC is the property owner/developer of record for Arwa Coffee, per its TDLR project registration.
Who is the architect or design firm for Arwa Coffee?
BA Design Studio is the design firm of record for Arwa Coffee, according to its TDLR filing.
How much does Arwa Coffee cost and how big is it?
Arwa Coffee has an estimated construction value of $150K and approximately 1,900 square feet (about $79/sqft), based on its TDLR filing.
๐Scope of Work
Arwa coffee ia a cafe that sell Arabic coffee
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 24, 2024
Review Complete
Sep 24, 2024
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$350K total๐๏ธSame Design Firm
$1.1M total๐Related City Permits
Building permits found at or near this location
Interior Non-Structural Demolition
Interior remodel of existing office space.
Interior Alteration to create new corridor approx. (932) of existing interior space. (Floor 4 Building V)
Interior Alteration of Approx. (4810) of existing Suite 400.
Interior Alteration of Approx. (3895) of existing Suite 425.