Project has been completed and closed
Rio Tower First Floor Blood Draw is a Renovation/Alteration project located at 4502 Medical Dr, San Antonio, TX 78229 in San Antonio, Texas. The project has an estimated value of $450K covering 1,285 sq ft. University Health is the property owner and Chesney Morales Partners, Inc is the design firm of record. The project was registered with TDLR on October 30, 2024.
Rio Tower First Floor Blood Draw is a renovation/alteration project at 4502 Medical Dr, San Antonio, TX 78229 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Convert former Discharge Pharmacy to Blood Draw. Add Patient Toilet Room, add new doors, door frames and hardware. Revise Mechanical, Electrical, Plumbing, Fire Alarm and Fire Suppression System
Construction on Rio Tower First Floor Blood Draw is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Rio Tower First Floor Blood Draw is located at 4502 Medical Dr, San Antonio, TX 78229, San Antonio, TX, 78229, in Bexar County.
University Health is the property owner/developer of record for Rio Tower First Floor Blood Draw, per its TDLR project registration.
Chesney Morales Partners, Inc is the design firm of record for Rio Tower First Floor Blood Draw, according to its TDLR filing.
Rio Tower First Floor Blood Draw has an estimated construction value of $450K and approximately 1,285 square feet (about $350/sqft), based on its TDLR filing.
Convert former Discharge Pharmacy to Blood Draw. Add Patient Toilet Room, add new doors, door frames and hardware. Revise Mechanical, Electrical, Plumbing, Fire Alarm and Fire Suppression System
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Oct 30, 2024
Review Complete
Inspection Complete
Dec 31, 2025
Closed
Jan 30, 2026