MCAT
MCAT is a renovation/alteration project at 15473 East Freeway, Channelview, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $8.0M across about 5,700 sq ft.
๐Project Metrics
TDLR #TABS2025006964Project Closed
Project has been completed and closed
MCAT is a Renovation/Alteration project located at 15473 East Freeway, Channelview, TX 77530 in Channelview, Texas. The project has an estimated value of $8.0M covering 5,700 sq ft. Mustang CAT is the property owner and Goree is the design firm of record. The project was registered with TDLR on December 5, 2024.
โFrequently Asked Questions
What is MCAT?
MCAT is a renovation/alteration project at 15473 East Freeway in Channelview, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: renovation to an existing storage facility and site
Is MCAT open in Channelview?
Construction on MCAT is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.
Where is MCAT located?
MCAT is located at 15473 East Freeway, Channelview, TX, 77530, in Harris County.
Who is the owner or developer of MCAT?
Mustang CAT is the property owner/developer of record for MCAT, per its TDLR project registration.
Who is the architect or design firm for MCAT?
Goree is the design firm of record for MCAT, according to its TDLR filing.
How much does MCAT cost and how big is it?
MCAT has an estimated construction value of $8.0M and approximately 5,700 square feet (about $1.40K/sqft), based on its TDLR filing.
๐Scope of Work
renovation to an existing storage facility and site
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 5, 2024
Review Complete
Dec 5, 2024
Inspection Complete
Closed
Aug 5, 2026