Falcon Ridge Ph 2
Falcon Ridge Ph 2 is a new construction project at 2507 N TEXAS AVE, Bryan, in Brazos County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $75K across about 9,000 sq ft.
๐Project Metrics
TDLR #TABS2025008930Review Complete
Design review complete, construction may proceed
Falcon Ridge Ph 2 is a New Construction project located at 2507 N TEXAS AVE, Bryan, TX 77803 in Bryan, Texas. The project has an estimated value of $75K covering 9,000 sq ft. Steve Pittman is the property owner and J4 Engineering is the design firm of record. The project was registered with TDLR on January 7, 2025.
โFrequently Asked Questions
What is Falcon Ridge Ph 2?
Falcon Ridge Ph 2 is a new construction project at 2507 N TEXAS AVE in Bryan, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Residential Subdivision
Is Falcon Ridge Ph 2 open in Bryan?
Falcon Ridge Ph 2 is currently under construction in Bryan, TX. Its current TDLR status is "Review Complete".
Where is Falcon Ridge Ph 2 located?
Falcon Ridge Ph 2 is located at 2507 N TEXAS AVE, Bryan, TX, 77803, in Brazos County.
Who is the owner or developer of Falcon Ridge Ph 2?
Steve Pittman is the property owner/developer of record for Falcon Ridge Ph 2, per its TDLR project registration.
Who is the architect or design firm for Falcon Ridge Ph 2?
J4 Engineering is the design firm of record for Falcon Ridge Ph 2, according to its TDLR filing.
How much does Falcon Ridge Ph 2 cost and how big is it?
Falcon Ridge Ph 2 has an estimated construction value of $75K and approximately 9,000 square feet (about $8/sqft), based on its TDLR filing.
๐Scope of Work
Residential Subdivision
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 7, 2025
Review Complete
Jan 7, 2025
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$125K total๐๏ธSame Design Firm
$1.9M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Brazos County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Brazos County
Find General Contractors in Brazos