SPEC SUITE
SPEC SUITE is a renovation/alteration project at 1624 FM 423 #STE. 300, Little Elm, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $80K across about 1,463 sq ft.
๐Project Metrics
TDLR #TABS2025009780Review Complete
Design review complete, construction may proceed
SPEC SUITE is a Renovation/Alteration project located at 1624 FM 423 #STE. 300, Little Elm, TX 75033 in Little Elm, Texas. The project has an estimated value of $80K covering 1,463 sq ft. GOLDEN WHEAT INVESTMENT LLC is the property owner and BEAR DESIGN BUILD is the design firm of record. The project was registered with TDLR on January 16, 2025.
โFrequently Asked Questions
What is SPEC SUITE?
SPEC SUITE is a renovation/alteration project at 1624 FM 423 #STE. 300 in Little Elm, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: SPEC SUITE
Is SPEC SUITE open in Little Elm?
SPEC SUITE is currently under construction in Little Elm, TX. Its current TDLR status is "Review Complete".
Where is SPEC SUITE located?
SPEC SUITE is located at 1624 FM 423 #STE. 300, Little Elm, TX, 75033, in Denton County.
Who is the owner or developer of SPEC SUITE?
GOLDEN WHEAT INVESTMENT LLC is the property owner/developer of record for SPEC SUITE, per its TDLR project registration.
Who is the architect or design firm for SPEC SUITE?
BEAR DESIGN BUILD is the design firm of record for SPEC SUITE, according to its TDLR filing.
How much does SPEC SUITE cost and how big is it?
SPEC SUITE has an estimated construction value of $80K and approximately 1,463 square feet (about $55/sqft), based on its TDLR filing.
๐Scope of Work
SPEC SUITE
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 16, 2025
Review Complete
Jan 16, 2025
Inspection Complete
Closed