Yaupon Trails Subdivision, Phase 8-B is a renovation/alteration project at Berry Branch Lane at Hardy Weedon Road, Bryan, in Brazos County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $109K across about 16,277 sq ft.
Project has been completed and closed
Yaupon Trails Subdivision, Phase 8-B is a Renovation/Alteration project located at Berry Branch Lane at Hardy Weedon Road, Bryan, TX 77802 in Bryan, Texas. The project has an estimated value of $109K covering 16,277 sq ft. 1983 Land Investment, LLC is the property owner and Schultz Engineering, LLC is the design firm of record. The project was registered with TDLR on February 5, 2025.
Yaupon Trails Subdivision, Phase 8-B is a renovation/alteration project at Berry Branch Lane at Hardy Weedon Road in Bryan, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalks, curb ramps and cross walks
Construction on Yaupon Trails Subdivision, Phase 8-B is complete โ TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
Yaupon Trails Subdivision, Phase 8-B is located at Berry Branch Lane at Hardy Weedon Road, Bryan, TX, 77802, in Brazos County.
1983 Land Investment, LLC is the property owner/developer of record for Yaupon Trails Subdivision, Phase 8-B, per its TDLR project registration.
Schultz Engineering, LLC is the design firm of record for Yaupon Trails Subdivision, Phase 8-B, according to its TDLR filing.
Yaupon Trails Subdivision, Phase 8-B has an estimated construction value of $109K and approximately 16,277 square feet (about $7/sqft), based on its TDLR filing.
Sidewalks, curb ramps and cross walks
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Feb 5, 2025
Review Complete
Feb 5, 2025
Inspection Complete
Dec 16, 2025
Closed
May 15, 2026
314d
Construction phase