PANERA 6427
PANERA 6427 is a renovation/alteration project at 1060 Hero Way, Leander, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $750K across about 2,400 sq ft.
๐Project Metrics
TDLR #TABS2025012269Review Complete
Design review complete, construction may proceed
PANERA 6427 is a Renovation/Alteration project located at 1060 Hero Way, Leander, TX 78641 in Leander, Texas. The project has an estimated value of $750K covering 2,400 sq ft. Zishan Momin is the property owner and ARCVISION is the design firm of record. The project was registered with TDLR on February 19, 2025.
โFrequently Asked Questions
What is PANERA 6427?
PANERA 6427 is a renovation/alteration project at 1060 Hero Way in Leander, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: TENANT INTERIOR ALTERATION TO INCLUDE NEW WALLS FINISHES FIXTURES AND PAINT
Is PANERA 6427 open in Leander?
PANERA 6427 is currently under construction in Leander, TX. Its current TDLR status is "Review Complete".
Where is PANERA 6427 located?
PANERA 6427 is located at 1060 Hero Way, Leander, TX, 78641, in Travis County.
Who is the owner or developer of PANERA 6427?
Zishan Momin is the property owner/developer of record for PANERA 6427, per its TDLR project registration.
Who is the architect or design firm for PANERA 6427?
ARCVISION is the design firm of record for PANERA 6427, according to its TDLR filing.
How much does PANERA 6427 cost and how big is it?
PANERA 6427 has an estimated construction value of $750K and approximately 2,400 square feet (about $313/sqft), based on its TDLR filing.
๐Scope of Work
TENANT INTERIOR ALTERATION TO INCLUDE NEW WALLS FINISHES FIXTURES AND PAINT
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 19, 2025
Review Complete
Feb 19, 2025
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$3.5M total๐๏ธSame Design Firm
$145.1M total๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater
Replacement of an existing water heater
Replace walk in shower
Replace walk in shower
Express- Install 18 replacement windows like for like.