Construction complete ยท Mar 2025๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project is privately funded, on private land for private use.

HPI Office - Floor 2

901 S. Mopac Expressway Building 3, Suite 220, Austin, TX 78746, Austin, TX, 78746

HPI Office - Floor 2 is a renovation/alteration project at 901 S. Mopac Expressway Building 3, Suite 220, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2025). The project has an estimated value of $550K across about 9,887 sq ft.

Completed100%

๐Ÿ“ŠProject Metrics

TDLR #TABS2025013350
$550K
Project Value
9,887
Square Feet
$56/sqft
Cost/SqFt
4 months
Duration
Registered:Mar 5, 2025
Start:Apr 6, 2025
Target:Aug 3, 2025
๐Ÿ

Project Closed

Project has been completed and closed

HPI Office - Floor 2 is a Renovation/Alteration project located at 901 S. Mopac Expressway Building 3, Suite 220, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $550K covering 9,887 sq ft. HPIBOP 2&3 JV LP is the property owner and S. Tipton Studio is the design firm of record. The project was registered with TDLR on March 5, 2025.

โ“Frequently Asked Questions

What is HPI Office - Floor 2?

HPI Office - Floor 2 is a renovation/alteration project at 901 S. Mopac Expressway Building 3, Suite 220 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing suites for new tenant.

Is HPI Office - Floor 2 open in Austin?

Construction on HPI Office - Floor 2 is complete โ€” TDLR records show the project passed its required accessibility inspection in Mar 2025. The building is finished and very likely open.

Where is HPI Office - Floor 2 located?

HPI Office - Floor 2 is located at 901 S. Mopac Expressway Building 3, Suite 220, Austin, TX, 78746, in Travis County.

Who is the owner or developer of HPI Office - Floor 2?

HPIBOP 2&3 JV LP is the property owner/developer of record for HPI Office - Floor 2, per its TDLR project registration.

Who is the architect or design firm for HPI Office - Floor 2?

S. Tipton Studio is the design firm of record for HPI Office - Floor 2, according to its TDLR filing.

How much does HPI Office - Floor 2 cost and how big is it?

HPI Office - Floor 2 has an estimated construction value of $550K and approximately 9,887 square feet (about $56/sqft), based on its TDLR filing.

๐Ÿ“‹Scope of Work

Remodel of existing suites for new tenant.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
March 5, 2025
Project Closed
March 5, 2025
Construction Start
April 6, 2025
Expected Completion
August 3, 2025

๐Ÿ“…Project Timeline

Filed

Mar 5, 2025

Review Complete

Inspection Complete

Closed

Mar 5, 2025

๐Ÿ“„Related City Permits

Building permits found at or near this location

901 1/2 S MOPAC EXPY SVRD NB

Verizon proposed fiber installation - boring conduit from ROW to proposed fiber vault/ building entry. No backup batteries or generator proposed.

ActiveBuilding PermitRemodelJun 2026
View Details
2026-081122 BP
๐Ÿ”งMidland Tower Construction LP
901 S MOPAC EXPY SVRD NB BLDG 4 UNIT 180

Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.

ActivePlumbing PermitRemodelJun 2026
View Details
2026-076582 PP
๐Ÿ”งCentral Texas Plumbing
9011 COPANO DR

Replacement of complete existing central heat and air system with or without duct work

ActiveMechanical PermitChange OutJun 2026
View Details
2026-068797 MP
๐Ÿ”งFox Service Company
901 E 5TH ST

Modifying Existing Switch Gear to Install Backup Generator receptacles to the outside of the building. We are not installing or Modifying the Generators on site. Just the Ability to hook up a portable one. Circuit is to MSB with Kirk key. No ATS.

ActiveElectrical PermitRemodelJun 2026
View Details
2026-062520 EP
๐Ÿ”งFuture Enterprises Inc
901 S MOPAC EXPY SVRD NB BLDG 4 UNIT 180

Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.

ActiveElectrical PermitRemodelJun 2026
View Details
2026-076582 EP
๐Ÿ”งAustin Capital Electric LLC

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists