Georgetown Neighborhood Park Improvements - Donegal Park
๐Project Metrics
TDLR #TABS2025014609Project Registered
Project has been registered with TDLR and is in pre-construction phase
๐Scope of Work
37,936 Square Feet of Park Improvements. To include: monument sign, sidewalks, drinking fountain, shade structure, pet waste station, trash receptacle, picnic table, planting, irrigation.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$680K total๐๏ธSame Design Firm
$1.7M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Requesting to disconnect and reconnect. Updating old electrical panel to new 200 amp installing proper grounding replacing meter base and adding surge protection
The scope of work planned includes: installation and relocation of existing beverage equipment gondolas and food warming equipment. MOdifications to the existing plumbing and electrical systems as needed for the new and relocated equipment.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 1.5 ton vertical heatpump system
New construction single-family residential 1-story 4 bedroom 3 bath with attached 2-car garage covered front porch and covered rear patio.
Express: Foundation Repair