Dumplings 1604
Dumplings 1604 is a renovation/alteration project at 415 W 1604 S 113, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $80K across about 2,219 sq ft.
๐Project Metrics
TDLR #TABS2025016987Review Complete
Design review complete, construction may proceed
Dumplings 1604 is a Renovation/Alteration project located at 415 W 1604 S 113, San Antonio, TX 78245 in San Antonio, Texas. The project has an estimated value of $80K covering 2,219 sq ft. C&Z Lonni, LLC is the property owner and Open Studio is the design firm of record. The project was registered with TDLR on April 18, 2025.
โFrequently Asked Questions
What is Dumplings 1604?
Dumplings 1604 is a renovation/alteration project at 415 W 1604 S 113 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out
Is Dumplings 1604 open in San Antonio?
Dumplings 1604 is currently under construction in San Antonio, TX. Its current TDLR status is "Review Complete".
Where is Dumplings 1604 located?
Dumplings 1604 is located at 415 W 1604 S 113, San Antonio, TX, 78245, in Bexar County.
Who is the owner or developer of Dumplings 1604?
C&Z Lonni, LLC is the property owner/developer of record for Dumplings 1604, per its TDLR project registration.
Who is the architect or design firm for Dumplings 1604?
Open Studio is the design firm of record for Dumplings 1604, according to its TDLR filing.
How much does Dumplings 1604 cost and how big is it?
Dumplings 1604 has an estimated construction value of $80K and approximately 2,219 square feet (about $36/sqft), based on its TDLR filing.
๐Scope of Work
Interior finish out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 18, 2025
Review Complete
Apr 18, 2025
Inspection Complete
Closed