Spec Suite 200
Spec Suite 200 is a renovation/alteration project at 1900 Firman Suite 200, Richardson, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $84K across about 8,965 sq ft.
๐Project Metrics
TDLR #TABS2025018474Review Complete
Design review complete, construction may proceed
Spec Suite 200 is a Renovation/Alteration project located at 1900 Firman Suite 200, Richardson, TX 75081 in Richardson, Texas. The project has an estimated value of $84K covering 8,965 sq ft. Avistone is the property owner and DRAWbridge is the design firm of record. The project was registered with TDLR on May 7, 2025.
โFrequently Asked Questions
What is Spec Suite 200?
Spec Suite 200 is a renovation/alteration project at 1900 Firman Suite 200 in Richardson, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Tenant Finish Out
Is Spec Suite 200 open in Richardson?
Spec Suite 200 is currently under construction in Richardson, TX. Its current TDLR status is "Review Complete".
Where is Spec Suite 200 located?
Spec Suite 200 is located at 1900 Firman Suite 200, Richardson, TX, 75081, in Dallas County.
Who is the owner or developer of Spec Suite 200?
Avistone is the property owner/developer of record for Spec Suite 200, per its TDLR project registration.
Who is the architect or design firm for Spec Suite 200?
DRAWbridge is the design firm of record for Spec Suite 200, according to its TDLR filing.
How much does Spec Suite 200 cost and how big is it?
Spec Suite 200 has an estimated construction value of $84K and approximately 8,965 square feet (about $9/sqft), based on its TDLR filing.
๐Scope of Work
Interior Tenant Finish Out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 7, 2025
Review Complete
May 7, 2025
Inspection Complete
Closed