205 N Mays Kitchen
205 N Mays Kitchen is a additions to existing building project at 205 N Mays Street, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $70K across about 595 sq ft.
๐Project Metrics
TDLR #TABS2025018927Project Registered
Project has been registered with TDLR and is in pre-construction phase
205 N Mays Kitchen is a Additions to Existing Building project located at 205 N Mays Street, Round Rock, TX 78664 in Round Rock, Texas. The project has an estimated value of $70K covering 595 sq ft. HUEBINGER, STEPHANIE A is the property owner. The project was registered with TDLR on May 14, 2025.
โFrequently Asked Questions
What is 205 N Mays Kitchen?
205 N Mays Kitchen is a additions to existing building project at 205 N Mays Street in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Add commercial kitchen to existing building.
Is 205 N Mays Kitchen open in Round Rock?
205 N Mays Kitchen is currently under construction in Round Rock, TX. Its current TDLR status is "Project Registered".
Where is 205 N Mays Kitchen located?
205 N Mays Kitchen is located at 205 N Mays Street, Round Rock, TX, 78664, in Williamson County.
Who is the owner or developer of 205 N Mays Kitchen?
HUEBINGER, STEPHANIE A is the property owner/developer of record for 205 N Mays Kitchen, per its TDLR project registration.
How much does 205 N Mays Kitchen cost and how big is it?
205 N Mays Kitchen has an estimated construction value of $70K and approximately 595 square feet (about $118/sqft), based on its TDLR filing.
๐Scope of Work
Add commercial kitchen to existing building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 14, 2025
Review Complete
Inspection Complete
Closed
๐Related City Permits
Building permits found at or near this location
15 tunnel below the pier and beam foundation to replace the entire drain system. excludes kitchen and utility drain lines. 1 access hole in front
Replacement of complete existing central heat and air system with or without duct work
INSTALLING ILLUMINATED WALL SIGN
INSTALLING ILLUMINATED WALL SIGNS
New in-ground pool (287 sqft) and spa (36 sqft) at rear of residence. Remove portion of existing wood deck (336 sqft)