Meta Restoration
Meta Restoration is a renovation/alteration project at 300 W 6th St., Suites 900, 1000, 1100, 1200, 1300, 1400, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $3.0M across about 191,711 sq ft.
๐Project Metrics
TDLR #TABS2026008852Review Complete
Design review complete, construction may proceed
Meta Restoration is a Renovation/Alteration project located at 300 W 6th St., Suites 900, 1000, 1100, 1200, 1300, 1400, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $3.0M covering 191,711 sq ft. CSHV-300 is the property owner and Sixthriver Architects is the design firm of record. The project was registered with TDLR on December 23, 2025.
โFrequently Asked Questions
What is Meta Restoration?
Meta Restoration is a renovation/alteration project at 300 W 6th St., Suites 900, 1000, 1100, 1200, 1300, 1400 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior alteration of an existing office space
Is Meta Restoration open in Austin?
Meta Restoration is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is Meta Restoration located?
Meta Restoration is located at 300 W 6th St., Suites 900, 1000, 1100, 1200, 1300, 1400, Austin, TX, 78701, in Travis County.
Who is the owner or developer of Meta Restoration?
CSHV-300 is the property owner/developer of record for Meta Restoration, per its TDLR project registration.
Who is the architect or design firm for Meta Restoration?
Sixthriver Architects is the design firm of record for Meta Restoration, according to its TDLR filing.
How much does Meta Restoration cost and how big is it?
Meta Restoration has an estimated construction value of $3.0M and approximately 191,711 square feet (about $16/sqft), based on its TDLR filing.
๐Scope of Work
Interior alteration of an existing office space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 23, 2025
Review Complete
Jun 20, 2026
Inspection Complete
Closed
179d
Review duration
๐Related Projects
๐คSame Owner
$12.3M total๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater replacing like/like G water heater
Sewer line replacement from the home to the city tap connection. Total length of sewer line is approximately 80 feet long
ePlan: Commercial Expedited Review - Interior and Exterior Remodel to Existing Fraternity House on UT Campus (12000 SF)
Change of use to retail with remodel. (2026-032693 DA)
ePlan: Commercial Expedited Review - Interior and Exterior Remodel to Existing Fraternity House on UT Campus (12000 SF)