Project intelligenceTDLR TABS2026010440Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Meta Restoration Phase II

300 W. 6th St. Suites 900, 1000, 1100, Austin, TX, 78701

Target date passed (Jun 2026)Review Complete

Meta Restoration Phase II is a renovation/alteration project at 300 W. 6th St. Suites 900, 1000, 1100, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.5M across about 1,415 sq ft.

Estimated project value
$2.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,415 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.77K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 20, 2026161 days across supplied datesJun 30, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    40 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    111 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    10 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78701 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Meta Restoration Phase II is a Renovation/Alteration project located at 300 W. 6th St. Suites 900, 1000, 1100, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $2.5M covering 1,415 sq ft. CSHV-300 is the property owner and Sixthriver Architects is the design firm of record. The project was registered with TDLR on January 20, 2026.

Frequently Asked Questions

What is Meta Restoration Phase II?

Meta Restoration Phase II is a renovation/alteration project at 300 W. 6th St. Suites 900, 1000, 1100 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Removal of interior non-fire stair and slab infill

Is Meta Restoration Phase II open in Austin?

Meta Restoration Phase II was scheduled to finish construction in Jun 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Meta Restoration Phase II located?

Meta Restoration Phase II is located at 300 W. 6th St. Suites 900, 1000, 1100, Austin, TX, 78701, in Travis County.

Who is the owner or developer of Meta Restoration Phase II?

CSHV-300 is the property owner/developer of record for Meta Restoration Phase II, per its TDLR project registration.

Who is the architect or design firm for Meta Restoration Phase II?

Sixthriver Architects is the design firm of record for Meta Restoration Phase II, according to its TDLR filing.

How much does Meta Restoration Phase II cost and how big is it?

Meta Restoration Phase II has an estimated construction value of $2.5M and approximately 1,415 square feet (about $1.77K/sqft), based on its TDLR filing.

Scope of Work

Removal of interior non-fire stair and slab infill

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

300 W. 6th St. Suites 900, 1000, 1100, Austin, TX, 78701

Location by street address

Related City Permits

Building permits found at or near this location

3005 CARLISLE DR

Express: Foundation Repair

ActiveBuilding PermitRepairSep 2026
$1
View Details
2026-105148 BP
3001 GOODWIN AVE BLDG 3

New construction of three story sfr with attached garage 3.5 baths and 2 bedrooms

ActiveMechanical PermitNewSep 2026
View Details
2025-079706 MP
GeauxPro Air
3001 GOODWIN AVE BLDG 2

New construction of three story sfr with attached garage 3.5 baths and 2 bedrooms

ActiveMechanical PermitNewSep 2026
View Details
2025-079705 MP
GeauxPro Air
3002 WEBBERVILLE RD BLDG 2

Irrigation Front and Back

ActivePlumbing PermitIrrigationSep 2026
View Details
2026-115056 PP
3004 HONEY TREE LN

BASE: Installing a backup battery system and additional meter socket.

ActiveElectrical PermitAuxiliary PowerSep 2026