Meta Restoration Phase II
Meta Restoration Phase II is a renovation/alteration project at 300 W. 6th St. Suites 900, 1000, 1100, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $2.5M across about 1,415 sq ft.
๐Project Metrics
TDLR #TABS2026010440Review Complete
Design review complete, construction may proceed
Meta Restoration Phase II is a Renovation/Alteration project located at 300 W. 6th St. Suites 900, 1000, 1100, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $2.5M covering 1,415 sq ft. CSHV-300 is the property owner and Sixthriver Architects is the design firm of record. The project was registered with TDLR on January 20, 2026.
โFrequently Asked Questions
What is Meta Restoration Phase II?
Meta Restoration Phase II is a renovation/alteration project at 300 W. 6th St. Suites 900, 1000, 1100 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Removal of interior non-fire stair and slab infill
Is Meta Restoration Phase II open in Austin?
Meta Restoration Phase II is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is Meta Restoration Phase II located?
Meta Restoration Phase II is located at 300 W. 6th St. Suites 900, 1000, 1100, Austin, TX, 78701, in Travis County.
Who is the owner or developer of Meta Restoration Phase II?
CSHV-300 is the property owner/developer of record for Meta Restoration Phase II, per its TDLR project registration.
Who is the architect or design firm for Meta Restoration Phase II?
Sixthriver Architects is the design firm of record for Meta Restoration Phase II, according to its TDLR filing.
How much does Meta Restoration Phase II cost and how big is it?
Meta Restoration Phase II has an estimated construction value of $2.5M and approximately 1,415 square feet (about $1.77K/sqft), based on its TDLR filing.
๐Scope of Work
Removal of interior non-fire stair and slab infill
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 20, 2026
Review Complete
Jun 20, 2026
Inspection Complete
Closed
151d
Review duration
๐Related Projects
๐คSame Owner
$6.5M total๐Related City Permits
Building permits found at or near this location
Sewer line replacement from the home to the city tap connection. Total length of sewer line is approximately 80 feet long
ePlan: Commercial Expedited Review - Interior and Exterior Remodel to Existing Fraternity House on UT Campus (12000 SF)
Change of use to retail with remodel. (2026-032693 DA)
ePlan: Commercial Expedited Review - Interior and Exterior Remodel to Existing Fraternity House on UT Campus (12000 SF)
ePlan: Residential Expedited Review - New construction of a 2-Story Duplex [4bed 4.5bath]. UNIT A