EDC
EDC is a renovation/alteration project at 8202 BREEN DR. SUITE 100, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $813K across about 94,994 sq ft.
๐Project Metrics
TDLR #TABS2026008942Review Complete
Design review complete, construction may proceed
EDC is a Renovation/Alteration project located at 8202 BREEN DR. SUITE 100, Houston, TX 77064 in Houston, Texas. The project has an estimated value of $813K covering 94,994 sq ft. FairBreen Industrial Place is the property owner and Lo Architecture is the design firm of record. The project was registered with TDLR on December 24, 2025.
โFrequently Asked Questions
What is EDC?
EDC is a renovation/alteration project at 8202 BREEN DR. SUITE 100 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior buildout in an existing shell building
Is EDC open in Houston?
EDC is still under construction in Houston, TX, with an estimated completion of Jun 2027 according to its TDLR registration.
Where is EDC located?
EDC is located at 8202 BREEN DR. SUITE 100, Houston, TX, 77064, in Harris County.
Who is the owner or developer of EDC?
FairBreen Industrial Place is the property owner/developer of record for EDC, per its TDLR project registration.
Who is the architect or design firm for EDC?
Lo Architecture is the design firm of record for EDC, according to its TDLR filing.
How much does EDC cost and how big is it?
EDC has an estimated construction value of $813K and approximately 94,994 square feet (about $9/sqft), based on its TDLR filing.
๐Scope of Work
Interior buildout in an existing shell building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 24, 2025
Review Complete
Mar 7, 2026
Inspection Complete
Closed
73d
Review duration