Spec Suite 410
Spec Suite 410 is a renovation/alteration project at 5525 Granite Pkwy Suite 410, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $213K across about 2,771 sq ft.
๐Project Metrics
TDLR #TABS2026009930Project Registered
Project has been registered with TDLR and is in pre-construction phase
Spec Suite 410 is a Renovation/Alteration project located at 5525 Granite Pkwy Suite 410, Plano, TX 75024 in Plano, Texas. The project has an estimated value of $213K covering 2,771 sq ft. Granite Park VI LP is the property owner and Entos Design is the design firm of record. The project was registered with TDLR on January 13, 2026.
โFrequently Asked Questions
What is Spec Suite 410?
Spec Suite 410 is a renovation/alteration project at 5525 Granite Pkwy Suite 410 in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 2,771
Is Spec Suite 410 open in Plano?
Spec Suite 410 is currently under construction in Plano, TX. Its current TDLR status is "Project Registered".
Where is Spec Suite 410 located?
Spec Suite 410 is located at 5525 Granite Pkwy Suite 410, Plano, TX, 75024, in Collin County.
Who is the owner or developer of Spec Suite 410?
Granite Park VI LP is the property owner/developer of record for Spec Suite 410, per its TDLR project registration.
Who is the architect or design firm for Spec Suite 410?
Entos Design is the design firm of record for Spec Suite 410, according to its TDLR filing.
How much does Spec Suite 410 cost and how big is it?
Spec Suite 410 has an estimated construction value of $213K and approximately 2,771 square feet (about $77/sqft), based on its TDLR filing.
๐Scope of Work
2,771
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 13, 2026
Review Complete
Inspection Complete
Closed