Spec Suite 420
Spec Suite 420 is a renovation/alteration project at 5525 Granite Pkwy Suite 420, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $132K across about 1,763 sq ft.
๐Project Metrics
TDLR #TABS2026009936Project Registered
Project has been registered with TDLR and is in pre-construction phase
Spec Suite 420 is a Renovation/Alteration project located at 5525 Granite Pkwy Suite 420, Plano, TX 75024 in Plano, Texas. The project has an estimated value of $132K covering 1,763 sq ft. Granite Park VI LP is the property owner and Entos Design is the design firm of record. The project was registered with TDLR on January 13, 2026.
โFrequently Asked Questions
What is Spec Suite 420?
Spec Suite 420 is a renovation/alteration project at 5525 Granite Pkwy Suite 420 in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1,763
Is Spec Suite 420 open in Plano?
Spec Suite 420 is currently under construction in Plano, TX. Its current TDLR status is "Project Registered".
Where is Spec Suite 420 located?
Spec Suite 420 is located at 5525 Granite Pkwy Suite 420, Plano, TX, 75024, in Collin County.
Who is the owner or developer of Spec Suite 420?
Granite Park VI LP is the property owner/developer of record for Spec Suite 420, per its TDLR project registration.
Who is the architect or design firm for Spec Suite 420?
Entos Design is the design firm of record for Spec Suite 420, according to its TDLR filing.
How much does Spec Suite 420 cost and how big is it?
Spec Suite 420 has an estimated construction value of $132K and approximately 1,763 square feet (about $75/sqft), based on its TDLR filing.
๐Scope of Work
1,763
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 13, 2026
Review Complete
Inspection Complete
Closed