FBISD BP036 Sitework Package 1 is a renovation/alteration project at 4400 Austin Parkway, Sugar Land, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2026. The project has an estimated value of $314K across about 8,560 sq ft.
Design review complete, construction may proceed
FBISD BP036 Sitework Package 1 is a Renovation/Alteration project located at 4400 Austin Parkway, Sugar Land, TX 77479 in Sugar Land, Texas. The project has an estimated value of $314K covering 8,560 sq ft. FBISD Design and Construction Department is the property owner and MWA Architects is the design firm of record. The project was registered with TDLR on February 9, 2026.
FBISD BP036 Sitework Package 1 is a renovation/alteration project at 4400 Austin Parkway in Sugar Land, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Resurface parking lot, repair sidewalks, regrade site around playground.
FBISD BP036 Sitework Package 1 is still under construction in Sugar Land, TX, with an estimated completion of Aug 2026 according to its TDLR registration.
FBISD BP036 Sitework Package 1 is located at 4400 Austin Parkway, Sugar Land, TX, 77479, in Fort Bend County.
FBISD Design and Construction Department is the property owner/developer of record for FBISD BP036 Sitework Package 1, per its TDLR project registration.
MWA Architects is the design firm of record for FBISD BP036 Sitework Package 1, according to its TDLR filing.
FBISD BP036 Sitework Package 1 has an estimated construction value of $314K and approximately 8,560 square feet (about $37/sqft), based on its TDLR filing.
Resurface parking lot, repair sidewalks, regrade site around playground.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Feb 9, 2026
Review Complete
Mar 1, 2026
Inspection Complete
Closed
20d
Review duration