Project intelligenceTDLR TABS2026012144Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

FBISD BP036 Sitework Package 1 in Houston, TX

6015 South Post Oak, Houston, TX, 77053

Opening ~Dec 2026Review Complete

FBISD BP036 Sitework Package 1 is a renovation/alteration project at 6015 South Post Oak, Houston, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $649K across about 1,000 sq ft.

Estimated project value
$649K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$649/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 10, 2026323 days across supplied datesDec 30, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    19 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    91 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    213 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About FBISD BP036 Sitework Package 1

Ridgegate ES at 6015 South Post Oak in Houston, TX 77053, is the site of a renovation project filed as FBISD BP036 Sitework Package 1. The work involves concrete parking and walk repair across 1,000 sq ft of site area. The estimated cost for this project is $649,095. Construction is scheduled to finish in December 2026, with work starting May 2026.

The owner of record is the FBISD Design and Construction Department. The design firm of record is MWA Architects. Kenneth Otten is the registered accessibility specialist for the project. The project was registered with TDLR in February 2026. TDLR completed plan review in March 2026. The project involves public funds, public land, or is a Federally funded roadway project.

Context and Comparison

This project's estimated cost of $649,095 is above the county median for renovation/alteration projects in Fort Bend County, which is $239,750. The scheduled build window of 213 days is longer than the county median of 92 days. The cost per square foot is $649, which is above the county median of $80.

FBISD Design and Construction Department has six other TDLR-registered projects totaling $5,048,675. These include FBISD Malala Elementary School in Richmond, Settlers Way ES in Sugar Land, Elkins HS in Missouri City, Missouri City MS in Missouri City, and Glover ES in Missouri City. MWA Architects has six other TDLR-registered projects totaling $8,400,000. These include HISD Wallnut Bend ES in Houston, Travis HS in Richmond, Quail Valley Middle school in Missouri City, FBISD Malala Elementary School in Richmond, and IAH AB Garage in Houston.

The ZIP code 77053 has a population of about 30,256 according to U.S. Census ACS 2023 five-year estimates. The median household income is $63,739. There are 9,716 housing units. The median owner-occupied home value is $166,200. Housing is mostly owner-occupied. Fort Bend County unemployment rate was 5 percent in July 2026, higher than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77053 (Houston)

One email per change. Unsubscribe in one click. Privacy.

FBISD BP036 Sitework Package 1 is a Renovation/Alteration project located at 6015 South Post Oak, Houston, TX 77053 in Houston, Texas. The project has an estimated value of $649K covering 1,000 sq ft. FBISD Design and Construction Department is the property owner and MWA Architects is the design firm of record. The project was registered with TDLR on February 10, 2026.

Frequently Asked Questions

What is the address of Ridgegate ES?

The project is located at 6015 South Post Oak in Houston, Texas 77053, within Fort Bend County.

What is the scope of work for this project?

The filing specifies that the scope of work involves concrete parking and walk repair at the site.

Who is the owner of record?

The owner of record for this project is the FBISD Design and Construction Department.

When is the project scheduled to finish?

The project is scheduled to finish in December 2026, with construction starting in May 2026.

Is the business open?

The TDLR record does not state whether the business is open. It only covers construction status.

What is FBISD BP036 Sitework Package 1?

FBISD BP036 Sitework Package 1 is a renovation/alteration project at 6015 South Post Oak in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Concrete parking and walk repair.

Is FBISD BP036 Sitework Package 1 open in Houston?

FBISD BP036 Sitework Package 1 is still under construction in Houston, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is FBISD BP036 Sitework Package 1 located?

FBISD BP036 Sitework Package 1 is located at 6015 South Post Oak, Houston, TX, 77053, in Fort Bend County.

Who is the owner or developer of FBISD BP036 Sitework Package 1?

FBISD Design and Construction Department is the property owner/developer of record for FBISD BP036 Sitework Package 1, per its TDLR project registration.

Who is the architect or design firm for FBISD BP036 Sitework Package 1?

MWA Architects is the design firm of record for FBISD BP036 Sitework Package 1, according to its TDLR filing.

How much does FBISD BP036 Sitework Package 1 cost and how big is it?

FBISD BP036 Sitework Package 1 has an estimated construction value of $649K and approximately 1,000 square feet (about $649/sqft), based on its TDLR filing.

Scope of Work

Concrete parking and walk repair.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

6015 South Post Oak, Houston, TX, 77053

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77053 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.