FBISD BP036 Sitework Package 1
FBISD BP036 Sitework Package 1 is a renovation/alteration project at 7007 KNIGHTS CT, Missouri City, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $1.2M across about 1,000 sq ft.
๐Project Metrics
TDLR #TABS2026012078Review Complete
Design review complete, construction may proceed
FBISD BP036 Sitework Package 1 is a Renovation/Alteration project located at 7007 KNIGHTS CT, Missouri City, TX 77459 in Missouri City, Texas. The project has an estimated value of $1.2M covering 1,000 sq ft. FBISD Design and Construction Department is the property owner and MWA Architects is the design firm of record. The project was registered with TDLR on February 9, 2026.
โFrequently Asked Questions
What is FBISD BP036 Sitework Package 1?
FBISD BP036 Sitework Package 1 is a renovation/alteration project at 7007 KNIGHTS CT in Missouri City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: SCOPE OF WORK: 1. REPLACE EXISTING COVERED WALKWAY AND COURTYARD CANOPY COVERING TO PROPERLY DRAIN AND JET CLEAN EXISTING STORM LINE. (SID36005) 2. REPLACE EXISTING SKYLIGHT SYSTEM. (SID36011) 3. REMOVE, REGRADE, AND REPLACE CONCRETE PAVโฆ
Is FBISD BP036 Sitework Package 1 open in Missouri City?
FBISD BP036 Sitework Package 1 is still under construction in Missouri City, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is FBISD BP036 Sitework Package 1 located?
FBISD BP036 Sitework Package 1 is located at 7007 KNIGHTS CT, Missouri City, TX, 77459, in Fort Bend County.
Who is the owner or developer of FBISD BP036 Sitework Package 1?
FBISD Design and Construction Department is the property owner/developer of record for FBISD BP036 Sitework Package 1, per its TDLR project registration.
Who is the architect or design firm for FBISD BP036 Sitework Package 1?
MWA Architects is the design firm of record for FBISD BP036 Sitework Package 1, according to its TDLR filing.
How much does FBISD BP036 Sitework Package 1 cost and how big is it?
FBISD BP036 Sitework Package 1 has an estimated construction value of $1.2M and approximately 1,000 square feet (about $1.20K/sqft), based on its TDLR filing.
๐Scope of Work
SCOPE OF WORK: 1. REPLACE EXISTING COVERED WALKWAY AND COURTYARD CANOPY COVERING TO PROPERLY DRAIN AND JET CLEAN EXISTING STORM LINE. (SID36005) 2. REPLACE EXISTING SKYLIGHT SYSTEM. (SID36011) 3. REMOVE, REGRADE, AND REPLACE CONCRETE PAVEMENT THAT HA
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 9, 2026
Review Complete
Mar 1, 2026
Inspection Complete
Closed
20d
Review duration