Red Wing Shoes
Red Wing Shoes is a renovation/alteration project at 655 West Illinois Ave., Suite 73, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $170K across about 1,837 sq ft.
๐Project Metrics
TDLR #TABS2026020114Review Complete
Design review complete, construction may proceed
Red Wing Shoes is a Renovation/Alteration project located at 655 West Illinois Ave., Suite 73, Dallas, TX 76224 in Dallas, Texas. The project has an estimated value of $170K covering 1,837 sq ft. Centro NP Holdings 12 SPE LLC is the property owner and TWP Architects, P.A. is the design firm of record. The project was registered with TDLR on May 12, 2026.
โFrequently Asked Questions
What is Red Wing Shoes?
Red Wing Shoes is a renovation/alteration project at 655 West Illinois Ave., Suite 73 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: GSF interior build-out remodeling of existing suite.
Is Red Wing Shoes open in Dallas?
Red Wing Shoes is currently under construction in Dallas, TX. Its current TDLR status is "Review Complete".
Where is Red Wing Shoes located?
Red Wing Shoes is located at 655 West Illinois Ave., Suite 73, Dallas, TX, 76224, in Dallas County.
Who is the owner or developer of Red Wing Shoes?
Centro NP Holdings 12 SPE LLC is the property owner/developer of record for Red Wing Shoes, per its TDLR project registration.
Who is the architect or design firm for Red Wing Shoes?
TWP Architects, P.A. is the design firm of record for Red Wing Shoes, according to its TDLR filing.
How much does Red Wing Shoes cost and how big is it?
Red Wing Shoes has an estimated construction value of $170K and approximately 1,837 square feet (about $93/sqft), based on its TDLR filing.
๐Scope of Work
GSF interior build-out remodeling of existing suite.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 12, 2026
Review Complete
Jul 1, 2026
Inspection Complete
Closed
50d
Review duration