Level 02: Procedure 275 (End of Life) Equipment Replacement
Level 02: Procedure 275 (End of Life) Equipment Replacement is a renovation/alteration project at 2401 South 31st Street, Temple, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2027. The project has an estimated value of $990K across about 731 sq ft.
๐Project Metrics
TDLR #TABS2026026489Project Registered
Project has been registered with TDLR and is in pre-construction phase
Level 02: Procedure 275 (End of Life) Equipment Replacement is a Renovation/Alteration project located at 2401 South 31st Street, Temple, TX 76508 in Temple, Texas. The project has an estimated value of $990K covering 731 sq ft. Scott & White Memorial Hospital is the property owner. The project was registered with TDLR on July 29, 2026.
โFrequently Asked Questions
What is Level 02: Procedure 275 (End of Life) Equipment Replacement?
Level 02: Procedure 275 (End of Life) Equipment Replacement is a renovation/alteration project at 2401 South 31st Street in Temple, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: equipment replacement project of a 731SQ Interventional Radiology room.
Is Level 02: Procedure 275 (End of Life) Equipment Replacement open in Temple?
Level 02: Procedure 275 (End of Life) Equipment Replacement is still under construction in Temple, TX, with an estimated completion of Feb 2027 according to its TDLR registration.
Where is Level 02: Procedure 275 (End of Life) Equipment Replacement located?
Level 02: Procedure 275 (End of Life) Equipment Replacement is located at 2401 South 31st Street, Temple, TX, 76508, in Bell County.
Who is the owner or developer of Level 02: Procedure 275 (End of Life) Equipment Replacement?
Scott & White Memorial Hospital is the property owner/developer of record for Level 02: Procedure 275 (End of Life) Equipment Replacement, per its TDLR project registration.
How much does Level 02: Procedure 275 (End of Life) Equipment Replacement cost and how big is it?
Level 02: Procedure 275 (End of Life) Equipment Replacement has an estimated construction value of $990K and approximately 731 square feet (about $1.35K/sqft), based on its TDLR filing.
๐Scope of Work
equipment replacement project of a 731SQ Interventional Radiology room.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 29, 2026
Review Complete
Inspection Complete
Closed