Texas ESBD research · Public solicitation

Design Build Full HVAC Replacements

SolicitationSource status: ClosedView official posting ↗

The listed deadline date has passed. The status above is the status supplied in the source record; confirm any extensions, award, or cancellation in the official posting.

Posted
June 9, 2026
About this figure

The posting date in the solicitation record. Follow the source link for revisions and addenda.

Listed deadline
July 7, 2026
About this figure

Listed submission time: 2:00 PM. Confirm the time zone and current deadline in the official posting.

Attached documents
3
About this figure

Documents linked to this solicitation in the available record. The official posting may contain additional files or later addenda.

Reported award
$9.20M
About this figure

The award amount supplied in the record. An undisclosed amount is not a zero-dollar award or a budget estimate.

The procurement record

Posting & submission dates

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 9, 202628 days across supplied datesJul 7, 2026

2 timeline dates shown.

  1. Solicitation posted · Schertz-Cibolo-Universal City ISD

    Source: Schertz-Cibolo-Universal City ISD

    View source record
  2. Listed submission deadline · Scheduled date

    Confirm submission time, time zone, extensions, and addenda in the official posting before responding.

    28 days after the preceding date shown.

    Source: Schertz-Cibolo-Universal City ISD

    View source record

Description

PROJECT OVERVIEW: Schertz-Cibolo-Universal City Independent School District is accepting qualification-based responses to provide a Design Build team to provide turnkey services for the assessment, design, demolition, replacement, and installation of HVAC systems at Schertz, Sippel, and Wiederstein Elementary Schools. Existing systems consist of split DX units with hot water coil heating (Trane, circa 2008–2009) and are assumed to be at or near end of useful life.

PRE-PROPOSAL MEETING: A non-mandatory Pre-Proposal Conference will be held at 10:00 am on June 16, 2026, at the Wiederstein Elementary School Cafeteria, located at 171 Borgfeld Rd., Cibolo, Texas 78108.

Commodity Codes (NIGP)

90900-Building Construction Services, New (Incl. Maintenance And Repair Services)Maintenance and Repair91200-Construction Services, General (Incl. Maintenance And Repair Services)General Construction90924-Building Construction, Commercial And InstitutionalMaintenance and Repair90927-Building Construction, EducationalMaintenance and Repair92544-General Construction: Management, Scheduling, Cost Estimation - Engineering96939-Professional Services/Contract SponsorshipsArchitectural and Engineering Services
Maintenance and RepairGeneral ConstructionArchitectural and Engineering Services

Key Details

Solicitation ID
26-022C
Source
ESBD
Source status
Closed
Category
heavy civil
Due Date
July 7, 2026at 2:00 PM
Posted
June 9, 2026
Posting Requirement
3

Agency

Schertz-Cibolo-Universal City ISD

School District

Agency #S0941

View agency profile →View all Schertz-Cibolo-Universal City ISD bids →

View the official posting on TX SmartBuy

View on TX SmartBuy