RFP 26-1392 EWCRWS Infrastructure and Expansion - Trinity Well and Phase 1D Project
The listed deadline date has passed. The status above is the status supplied in the source record; confirm any extensions, award, or cancellation in the official posting.
- Posted
- August 3, 2026
About this figure
The posting date in the solicitation record. Follow the source link for revisions and addenda.
- Listed deadline
- November 3, 2026
About this figure
Listed submission time: 10:00 AM. Confirm the time zone and current deadline in the official posting.
- Attached documents
- 0
About this figure
Documents linked to this solicitation in the available record. The official posting may contain additional files or later addenda.
- Reported award
- $216.00M
About this figure
The award amount supplied in the record. An undisclosed amount is not a zero-dollar award or a budget estimate.
The procurement record
Posting & submission dates
Explore filed milestones and scheduled dates. Open a milestone for its source.
2 timeline dates shown.
Solicitation posted · Brazos River Authority
Source: Brazos River Authority
View source recordListed submission deadline · Scheduled date
Confirm submission time, time zone, extensions, and addenda in the official posting before responding.
92 days after the preceding date shown.
Source: Brazos River Authority
View source record
Description
The BRA is soliciting sealed proposals for the EWCRWS Infrastructure and Expansion
The “1B1D PROJECT” represents two critical expansion improvements to the Brazos River Authority’s (BRA) East Williamson County’s Regional Water System Water Treatment Plant (EWCWTP); Phase 1B and Phase 1D.
The Phase 1B Trinity Well Infrastructure Improvements will use cooling towers to treat up to 4 MGD of groundwater from the existing Trinity Well #1 for blending with treated surface water from Granger Lake. Trinity Well #1 is located on the campus of the EWCWTP. Additionally, Phase 1B work located at the EWCWTP includes significant chemical monitoring and distribution systems, stormwater system, upgrades to electrical and automation, and access road improvements that provide future buildout resilience. Phase 1B has schedule priority.
The Phase 1D Short-term Expansion continues improvements at the EWCWTP to treat up to 13 MGD of additional surface water from Granger Lake by expanding raw water pumping capacity, upgrading storage reservoir inlets, outlets, and pumping capacity, upgrades to existing chemical systems, upgrades to electrical and automation systems, new rapid mix system, two new clarifiers, modify piping at four existing filters, four new additional filter systems, new backwash basin demolition of existing components and structures being replaced or removed, an additional 4.25 MG of finished water storage capacity for storage of blended treated groundwater (from Phase 1B) with treated surface water (from Phase 1D), and access road improvements. Phase 1D also includes a new medium service pump station for transmission of the finished water to the BRA’s existing and potential new customers, while providing future buildout resilience for longer term expansion.
Commodity Codes (NIGP)
More from Brazos River Authority
RFB No. 27-1402 Central Office Landscaping Services
Solid Waste Collection and Disposal Services at Possum Kingdom.
RFB No. 26-1399 Landscape and Mowing Services
Hydrostatic Pressure Relief System Assessment and Downstream River Channel Improvements at Sterling C. Robertson Dam
Technical Advisory Services for the Allens Creek Reservoir Project
Key Details
- Solicitation ID
- 26-1392
- Source
- ESBD
- Source status
- Addendum Posted
- Category
- heavy civil
- Due Date
- November 3, 2026at 10:00 AM
- Posted
- August 3, 2026
- Posting Requirement
- 3
Contact
Agency
Brazos River Authority
Special District
Agency #K4600
View agency profile →View all Brazos River Authority bids →View the official posting on TX SmartBuy
View on TX SmartBuy