Wise, Texas
Total Solicitations
200
Awarded Contracts
0
Total Value Awarded
$0
Average Award
β
Rehabilitation of Existing Roadways
PR0033 from Stephens C/L to end of PR 33
NCTCOG Air Quality FY 29
SH 174; FR W of IH 35 to Elk Dr.
FY 27 Seal Coat/ Pavement Preservation
NCTCOG Sign & Striping Assessment FY 29
US 81: Avondale-Haslet to NTP Op Imp.
VA; FY 29 Districtwide ADA Remediation
.FY28 Seal Coat Pavement Preservation
Regional Mobility Assistance FTW 2029
FM 917
Wickerhill Rd to N Main St.
US 281: from FM 3027 to FM 3027
IH 20; EB Entra Ranch House Rd to FM1187
Install Signals NSS 2029
FY 2029 Full Depth Concrete Repair
VA; BIKE PED SAFETY POOL
Smithfield: Mid Cities Blvd to Texrail
CS; Broadway Ave, US 377 to SH 26-2
CS; Broadway Ave, US 377 to SH 26
US 81; WISE CL TO IH 35W
FM 51; North of Spring Creek Rd to Norri
VA; PEOPLE MOVER '26
SH 16; US 180 TO FM 207
CS: Westport Pkwy, High Mesa to SH 170FR
Va: Everman Safe Streets
Context sensitive design 2029 Ft Worth
FM 1902; At CR 920
NCTCOG High Speed Rail FY 29
NCTCOG Permits FY 29
IH 20; EB at SH 108
VA; FM 205 to Main St
US 67; Limits Intersection of CR 351
IH 20 WB at SH 108
IH 20 WB at SH 193
FM 2952 From FM 1810 to FM 1658
VA, Harwood Road
SH 108; At Middle Creek
Harwood Rd at Central Drive
FY29 Seal Coat/Pavement Preservation9
IH 30; IH 820 to W of Cooper St
FY.28.Seal Coat Pavement Preservation
FY29 Seal Coat/Pavement Preservation10
FM 2190: US 281 to SH 148 FY29SC
FY29 Seal Coat/Pavement Preservation7
FM 920: SH 114 to SH 199 FY29SC
FM 2580: FM 4 to Parker CL FY29SC
SH 183 at Calmont
On Bypass in Cresson
FM 1658; at Lake Bridgeport Spillway
NCTCOG Signal Timing FY 29
Install Pavement Markings 2028
FM 8 (Ollie St Intersection)
FM 2552 @ Black Warrior Branch
Sign and Striping Project
Bridge FUA's
US 281; @ US 380
E Rosedale: at Veal St 2
Sign and Striping Project..
BMIP FY28 Frontage
Install ITS WWD Systems 2029
Rail Crossing Safety
VA: Var loc within MPO Reg Safety
FM 1702; North of CR 316
NCTCOG OVERSITE PROGRAM FY 29
TMC Management 2029
IH 35W; at SE SH 170
NCTCOG Traveler Info System FY 28
NCTCOG ETR FY 29
NCTCOG Transit Analysis FY 29
NCTCOG Traveler Info System FY 29
NCTCOG Automated Vehicle FY 29
NCTCOG Regional study FY 29
SH 121 from Harwood Drive to SH 360
DMS/CCTV INS 2028
IH 20 from Eastland CL to Tarrant CL
Signs and Striping Project, Erath
Signs and Striping Project, Hood
2026 FTW SH 199
CFI Somervell County
CFI Erath
Main St; Trinity River to Weatherford St
Forest Hill Drive; at Forest Hill Circle
CR 307: at Beans Creek
Va; Veloweb Trl Mike Lewis Park
CS;Avondale/Haslet,IH 35W to Intermodal
FM 51; At Carter Hills Ln
SH 183; FM 157 to Bear Creek Blvd
VA; FY28 Districtwide ADA Remediation
SH 183 Expansion
Stop Six Improvements-Ramey Ave
CS; Horne St fr Vickery to Camp Bowie 2
BMIP FY28
SH 360 from E Mid Cities Blvd to SH 121
FM 917; at FM 731
CR 170: at Hill Creek
BMIP FY 2028.
BMIP FY 2028
US 287; W Sublett Rd to Johnson County
DMS/CCTV INS 2029
IH 20 from Parker CL to Dallas CL
BMIP FY 28
BMIP FY 28.
BMIP FY 28 at Bosley
Sept 28- Aug 29 Concr Full Depth Repair
Bonds Ranch Rd; Grade Separation at BNSF
FY 26 GR - IH20 Willow Park
FY27 SealCoat/Pavement Preservation
FY27Seal Coat/Pavement Preservation.1
FY26 Seal Coat;FM4, CR 1131 to US 67
FY28 Seal Coat/Pavement Preservation..
FY2026 - BPM Jack & Wise Counties
SH 16: SH 337 to SH 254
FM 2738 at FM 917
VA; VARIOUS LOCATIONS DISTRICTWIDE
Intersection of FM 1655 & US 287
FY26 Seal Coat; FM4, CR 1131 to US 67
FY27 SealCoat / Pavement Preservation
Reeder Rd; TRE Crossing to DOT 598343K
SH 174 from Chamber to Hillery
IH 35: at Turkey Creek
FY26 Seal Coat; RM2871, IH20 to IH30
FY27Seal Coat Pavement Preservation
FM 1885; Fr New Authon Rd To SS Rd
IH-30:@University Dr. and Clear Fork Tri
BU 377; US 377 to US 377
Butler Housing; At IH35W
E Rosedale St; At Veal St
CS: LTJG Barnett Bridge2 @ NASJRB
Forest Hill Dr-Lon Stephenson to Shelby
Ft Worth Parking upgrade 2029
Broadband deployment 2029 Ft Worth
NCTCOG Sign & Striping Assessment FY 28
IH 20 WB over Big Sunday Creek
IH 20 EB over Big Sunday Creek
US 67; Intersection of Live Oak
US 377J; From S. Dale Av. to Harbin Dr
US 377; Limits Intersection of FM 205
FM 1220; From IH 820 to Titus St.
SH171; From Hughie Long Rd. to FM 3450
FY28 SealCoat /Pavement Preservation
Richland Hills; Cheney Hills SRTS
FM 2481: FM 1824 to SH 220 FY29SC
FY29 Seal Coat/Pavement Preservation13
Summer 2029 District Sealcoat
US 287 / E Berry St GCAA Award
FM 2264: US 81 to FM 407 FY29SC
IH 30 FR; Linkcrest to Parker C/L
FM 1702: Commanche CL to FM 219 FY29SC
FY29 Seal Coat/Pavement Preservation8
FY29 Seal Coat/Pavement Preservation
FY29 Seal Coat/Pavement Preservation5
FY29 Seal Coat/Pavement Preservation11
FY29 Seal Coat/Pavement Preservation2
Oakland Blvd: E 1st St to E Rosedale
FY29 Seal Coat/Pavement Preservation16
BU 67; from US 67 to Grandbury St
VA: Various locations Centreport Trl #2
SH 180; COOPER ST TO COLLINS/FM 157
NCTCOG High Speed Rail FY 28
Crowley-Main Street Trail Extension
FM 1938; From IH 820 to Newman Dr.
FM 157: AT SIGNET DR.
FY28 Seal Coat.Pavement.Preservation.
GREAT SW PKWY AT MARSHALL DR
FY28 Seal Coat/Pavement Preservation10
US 377; From Glenview Dr to Starnes Rd
Basswood Blvd: Redding Dr to N BlueMound
BAILEY BOSWELL: AT JARVIS RD
SH 114; FM 51 S to US 81
SH10: AT DICKEY DR.
S GREAT SW PKWY: AT ARKANSAS LN.
SH 360; Arkansas Ln to SH 180
NCTCOG Air Quality FY 28
FY28 Seal Coat/Pavement Preservation9
FY28.Seal.Coat Pavement Preservation
FY28 Seal Coat/Pavement Preservation4
FY.28.Seal.Coat Pavement Preservation
FY..28 Seal Coat Pavement Preservation
FY28 Seal Coat.Pavement Preservation
FY28 Seal Coat Pavement Preservation
FY28 Seal Coat/Pavement Preservation.
FY.28 Seal Coat Pavement Preservation
FY28.Seal.Coat.Pavement Preservation
FY28 SealCoat/Pavement Preservation
FY28 Seal Coat.Pavement.Preservation
FY28 Seal Coat/Pavement Preservation7
FY28.Seal Coat Pavement Preservation
FY28 Seal Coat.Pavement Preservation.
Bomber Spur Trl; Camp Bowie to Vickery
Park Row Drive Pedestrian Improvements
FM 1187; Aledo Creeks Rd to Tarrant CoLn
US 180: AT COOL JCT
TMC Management 2027
AT&T Way: Division to Abram
North Texas Moves West Non Let
US 81/287; N of Harmon Rd to N of IH 35W
NCTCOG Sign & Striping Assessment FY 27
HSIP Systemic Median Barrier
Traffic TCD 2026
Most recent 200 solicitations, sorted by posting date
| Title | Type | Status | Due Date | Award Amount |
|---|---|---|---|---|
| Rehabilitation of Existing Roadways | Solicitation | Posted | Jul 1, 2029 | β |
| PR0033 from Stephens C/L to end of PR 33 | Solicitation | Posted | Nov 3, 2026 | β |
| NCTCOG Air Quality FY 29 | Solicitation | Posted | Jan 2, 2029 | β |
| SH 174; FR W of IH 35 to Elk Dr. | Solicitation | Posted | Mar 7, 2028 | β |
| FY 27 Seal Coat/ Pavement Preservation | Solicitation | Posted | Dec 1, 2026 | β |
| NCTCOG Sign & Striping Assessment FY 29 | Solicitation | Posted | Jan 2, 2029 | β |
| US 81: Avondale-Haslet to NTP Op Imp. | Solicitation | Posted | Apr 1, 2029 | β |
| VA; FY 29 Districtwide ADA Remediation | Solicitation | Posted | Jun 1, 2029 | β |
| .FY28 Seal Coat Pavement Preservation | Solicitation | Posted | Dec 1, 2027 | β |
| Regional Mobility Assistance FTW 2029 | Solicitation | Posted | Aug 2, 2029 | β |
| FM 917 | Solicitation | Posted | Aug 1, 2029 | β |
| Wickerhill Rd to N Main St. | Solicitation | Posted | Aug 1, 2029 | β |
| US 281: from FM 3027 to FM 3027 | Solicitation | Posted | Feb 2, 2028 | β |
| IH 20; EB Entra Ranch House Rd to FM1187 | Solicitation | Posted | Aug 1, 2029 | β |
| Install Signals NSS 2029 | Solicitation | Posted | Aug 1, 2029 | β |
| FY 2029 Full Depth Concrete Repair | Solicitation | Posted | Jul 1, 2029 | β |
| VA; BIKE PED SAFETY POOL | Solicitation | Posted | Jun 2, 2029 | β |
| Smithfield: Mid Cities Blvd to Texrail | Solicitation | Posted | May 16, 2029 | β |
| CS; Broadway Ave, US 377 to SH 26-2 | Solicitation | Posted | Apr 1, 2029 | β |
| CS; Broadway Ave, US 377 to SH 26 | Solicitation | Posted | Apr 1, 2029 | β |
| US 81; WISE CL TO IH 35W | Solicitation | Posted | Apr 1, 2029 | β |
| FM 51; North of Spring Creek Rd to Norri | Solicitation | Posted | Apr 1, 2029 | β |
| VA; PEOPLE MOVER '26 | Solicitation | Posted | Feb 3, 2029 | β |
| SH 16; US 180 TO FM 207 | Solicitation | Posted | Feb 1, 2029 | β |
| CS: Westport Pkwy, High Mesa to SH 170FR | Solicitation | Posted | Jan 5, 2029 | β |
| Va: Everman Safe Streets | Solicitation | Posted | Jan 5, 2029 | β |
| Context sensitive design 2029 Ft Worth | Solicitation | Posted | Jan 2, 2029 | β |
| FM 1902; At CR 920 | Solicitation | Posted | Aug 1, 2029 | β |
| NCTCOG High Speed Rail FY 29 | Solicitation | Posted | Jan 2, 2029 | β |
| NCTCOG Permits FY 29 | Solicitation | Posted | Jan 2, 2029 | β |
| IH 20; EB at SH 108 | Solicitation | Posted | Jan 1, 2029 | β |
| VA; FM 205 to Main St | Solicitation | Posted | Jan 1, 2029 | β |
| US 67; Limits Intersection of CR 351 | Solicitation | Posted | Jan 1, 2029 | β |
| IH 20 WB at SH 108 | Solicitation | Posted | Jan 1, 2029 | β |
| IH 20 WB at SH 193 | Solicitation | Posted | Jan 1, 2029 | β |
| FM 2952 From FM 1810 to FM 1658 | Solicitation | Posted | Jan 1, 2029 | β |
| VA, Harwood Road | Solicitation | Posted | Jan 1, 2029 | β |
| SH 108; At Middle Creek | Solicitation | Posted | Jan 1, 2029 | β |
| Harwood Rd at Central Drive | Solicitation | Posted | Jan 1, 2029 | β |
| FY29 Seal Coat/Pavement Preservation9 | Solicitation | Posted | Dec 5, 2028 | β |
| IH 30; IH 820 to W of Cooper St | Solicitation | Posted | Dec 5, 2028 | β |
| FY.28.Seal Coat Pavement Preservation | Solicitation | Posted | Dec 1, 2026 | β |
| FY29 Seal Coat/Pavement Preservation10 | Solicitation | Posted | Dec 5, 2028 | β |
| FM 2190: US 281 to SH 148 FY29SC | Solicitation | Posted | Dec 5, 2028 | β |
| FY29 Seal Coat/Pavement Preservation7 | Solicitation | Posted | Dec 5, 2028 | β |
| FM 920: SH 114 to SH 199 FY29SC | Solicitation | Posted | Dec 5, 2028 | β |
| FM 2580: FM 4 to Parker CL FY29SC | Solicitation | Posted | Dec 5, 2028 | β |
| SH 183 at Calmont | Solicitation | Posted | Jun 1, 2029 | β |
| On Bypass in Cresson | Solicitation | Posted | May 15, 2026 | β |
| FM 1658; at Lake Bridgeport Spillway | Solicitation | Posted | Oct 4, 2028 | β |
| NCTCOG Signal Timing FY 29 | Solicitation | Posted | Sep 1, 2028 | β |
| Install Pavement Markings 2028 | Solicitation | Posted | Sep 1, 2027 | β |
| FM 8 (Ollie St Intersection) | Solicitation | Posted | Oct 4, 2028 | β |
| FM 2552 @ Black Warrior Branch | Solicitation | Posted | Sep 1, 2027 | β |
| Sign and Striping Project | Solicitation | Posted | Sep 6, 2028 | β |
| Bridge FUA's | Solicitation | Posted | Sep 6, 2028 | β |
| US 281; @ US 380 | Solicitation | Posted | Sep 6, 2028 | β |
| E Rosedale: at Veal St 2 | Solicitation | Posted | Jan 2, 2029 | β |
| Sign and Striping Project.. | Solicitation | Posted | Sep 6, 2028 | β |
| BMIP FY28 Frontage | Solicitation | Posted | May 3, 2028 | β |
| Install ITS WWD Systems 2029 | Solicitation | Posted | Sep 6, 2028 | β |
| Rail Crossing Safety | Solicitation | Posted | Sep 6, 2028 | β |
| VA: Var loc within MPO Reg Safety | Solicitation | Posted | Sep 2, 2028 | β |
| FM 1702; North of CR 316 | Solicitation | Posted | Sep 2, 2028 | β |
| NCTCOG OVERSITE PROGRAM FY 29 | Solicitation | Posted | Sep 1, 2028 | β |
| TMC Management 2029 | Solicitation | Posted | Sep 1, 2028 | β |
| IH 35W; at SE SH 170 | Solicitation | Posted | Sep 1, 2028 | β |
| NCTCOG Traveler Info System FY 28 | Solicitation | Posted | Sep 1, 2028 | β |
| NCTCOG ETR FY 29 | Solicitation | Posted | Sep 1, 2028 | β |
| NCTCOG Transit Analysis FY 29 | Solicitation | Posted | Sep 1, 2028 | β |
| NCTCOG Traveler Info System FY 29 | Solicitation | Posted | Sep 1, 2028 | β |
| NCTCOG Automated Vehicle FY 29 | Solicitation | Posted | Sep 1, 2028 | β |
| NCTCOG Regional study FY 29 | Solicitation | Posted | Sep 1, 2028 | β |
| SH 121 from Harwood Drive to SH 360 | Solicitation | Posted | Aug 2, 2028 | β |
| DMS/CCTV INS 2028 | Solicitation | Posted | Aug 2, 2028 | β |
| IH 20 from Eastland CL to Tarrant CL | Solicitation | Posted | Aug 2, 2028 | β |
| Signs and Striping Project, Erath | Solicitation | Posted | Aug 2, 2028 | β |
| Signs and Striping Project, Hood | Solicitation | Posted | Aug 2, 2028 | β |
| 2026 FTW SH 199 | Solicitation | Posted | Aug 2, 2028 | β |
| CFI Somervell County | Solicitation | Posted | Aug 1, 2028 | β |
| CFI Erath | Solicitation | Posted | Aug 1, 2028 | β |
| Main St; Trinity River to Weatherford St | Solicitation | Posted | Jul 15, 2028 | β |
| Forest Hill Drive; at Forest Hill Circle | Solicitation | Posted | Jul 6, 2028 | β |
| CR 307: at Beans Creek | Solicitation | Posted | Apr 6, 2027 | β |
| Va; Veloweb Trl Mike Lewis Park | Solicitation | Posted | Jun 3, 2028 | β |
| CS;Avondale/Haslet,IH 35W to Intermodal | Solicitation | Posted | Jun 1, 2028 | β |
| FM 51; At Carter Hills Ln | Solicitation | Posted | Jun 1, 2028 | β |
| SH 183; FM 157 to Bear Creek Blvd | Solicitation | Posted | Aug 2, 2029 | β |
| VA; FY28 Districtwide ADA Remediation | Solicitation | Posted | Jun 1, 2028 | β |
| SH 183 Expansion | Solicitation | Posted | Aug 2, 2029 | β |
| Stop Six Improvements-Ramey Ave | Solicitation | Posted | May 16, 2028 | β |
| CS; Horne St fr Vickery to Camp Bowie 2 | Solicitation | Posted | May 12, 2028 | β |
| BMIP FY28 | Solicitation | Posted | May 3, 2028 | β |
| SH 360 from E Mid Cities Blvd to SH 121 | Solicitation | Posted | Aug 1, 2029 | β |
| FM 917; at FM 731 | Solicitation | Posted | Aug 1, 2029 | β |
| CR 170: at Hill Creek | Solicitation | Posted | Aug 1, 2029 | β |
| BMIP FY 2028. | Solicitation | Posted | May 3, 2028 | β |
| BMIP FY 2028 | Solicitation | Posted | May 3, 2028 | β |
| US 287; W Sublett Rd to Johnson County | Solicitation | Posted | Feb 2, 2028 | β |
| DMS/CCTV INS 2029 | Solicitation | Posted | Aug 1, 2029 | β |
| IH 20 from Parker CL to Dallas CL | Solicitation | Posted | Aug 1, 2029 | β |
| BMIP FY 28 | Solicitation | Posted | May 3, 2028 | β |
| BMIP FY 28. | Solicitation | Posted | May 3, 2028 | β |
| BMIP FY 28 at Bosley | Solicitation | Posted | May 3, 2028 | β |
| Sept 28- Aug 29 Concr Full Depth Repair | Solicitation | Posted | Jul 6, 2028 | β |
| Bonds Ranch Rd; Grade Separation at BNSF | Solicitation | Posted | Jun 1, 2029 | β |
| FY 26 GR - IH20 Willow Park | Solicitation | Posted | Jul 1, 2026 | β |
| FY27 SealCoat/Pavement Preservation | Solicitation | Posted | Dec 1, 2026 | β |
| FY27Seal Coat/Pavement Preservation.1 | Solicitation | Posted | Dec 1, 2026 | β |
| FY26 Seal Coat;FM4, CR 1131 to US 67 | Solicitation | Posted | Dec 1, 2026 | β |
| FY28 Seal Coat/Pavement Preservation.. | Solicitation | Posted | Dec 1, 2026 | β |
| FY2026 - BPM Jack & Wise Counties | Solicitation | Posted | Dec 2, 2026 | β |
| SH 16: SH 337 to SH 254 | Solicitation | Posted | Dec 1, 2026 | β |
| FM 2738 at FM 917 | Solicitation | Posted | Jun 1, 2028 | β |
| VA; VARIOUS LOCATIONS DISTRICTWIDE | Solicitation | Posted | May 1, 2028 | β |
| Intersection of FM 1655 & US 287 | Solicitation | Posted | Mar 15, 2029 | β |
| FY26 Seal Coat; FM4, CR 1131 to US 67 | Solicitation | Posted | Dec 1, 2026 | β |
| FY27 SealCoat / Pavement Preservation | Solicitation | Posted | Dec 1, 2026 | β |
| Reeder Rd; TRE Crossing to DOT 598343K | Solicitation | Posted | Apr 23, 2028 | β |
| SH 174 from Chamber to Hillery | Solicitation | Posted | Mar 1, 2029 | β |
| IH 35: at Turkey Creek | Solicitation | Posted | Apr 5, 2028 | β |
| FY26 Seal Coat; RM2871, IH20 to IH30 | Solicitation | Posted | Dec 1, 2026 | β |
| FY27Seal Coat Pavement Preservation | Solicitation | Posted | Dec 1, 2026 | β |
| FM 1885; Fr New Authon Rd To SS Rd | Solicitation | Posted | Feb 1, 2029 | β |
| IH-30:@University Dr. and Clear Fork Tri | Solicitation | Posted | Apr 5, 2028 | β |
| BU 377; US 377 to US 377 | Solicitation | Posted | Feb 1, 2029 | β |
| Butler Housing; At IH35W | Solicitation | Posted | Jan 2, 2029 | β |
| E Rosedale St; At Veal St | Solicitation | Posted | Jan 2, 2029 | β |
| CS: LTJG Barnett Bridge2 @ NASJRB | Solicitation | Posted | Jan 2, 2028 | β |
| Forest Hill Dr-Lon Stephenson to Shelby | Solicitation | Posted | Jan 2, 2029 | β |
| Ft Worth Parking upgrade 2029 | Solicitation | Posted | Jan 2, 2029 | β |
| Broadband deployment 2029 Ft Worth | Solicitation | Posted | Jan 2, 2029 | β |
| NCTCOG Sign & Striping Assessment FY 28 | Solicitation | Posted | Jan 1, 2028 | β |
| IH 20 WB over Big Sunday Creek | Solicitation | Posted | Jan 1, 2029 | β |
| IH 20 EB over Big Sunday Creek | Solicitation | Posted | Jan 1, 2029 | β |
| US 67; Intersection of Live Oak | Solicitation | Posted | Jan 1, 2029 | β |
| US 377J; From S. Dale Av. to Harbin Dr | Solicitation | Posted | Mar 7, 2028 | β |
| US 377; Limits Intersection of FM 205 | Solicitation | Posted | Jan 1, 2029 | β |
| FM 1220; From IH 820 to Titus St. | Solicitation | Posted | Mar 7, 2028 | β |
| SH171; From Hughie Long Rd. to FM 3450 | Solicitation | Posted | Mar 7, 2028 | β |
| FY28 SealCoat /Pavement Preservation | Solicitation | Posted | Dec 1, 2027 | β |
| Richland Hills; Cheney Hills SRTS | Solicitation | Posted | Mar 7, 2028 | β |
| FM 2481: FM 1824 to SH 220 FY29SC | Solicitation | Posted | Dec 5, 2028 | β |
| FY29 Seal Coat/Pavement Preservation13 | Solicitation | Posted | Dec 5, 2028 | β |
| Summer 2029 District Sealcoat | Solicitation | Posted | Dec 5, 2028 | β |
| US 287 / E Berry St GCAA Award | Solicitation | Posted | Feb 15, 2028 | β |
| FM 2264: US 81 to FM 407 FY29SC | Solicitation | Posted | Dec 5, 2028 | β |
| IH 30 FR; Linkcrest to Parker C/L | Solicitation | Posted | Feb 2, 2028 | β |
| FM 1702: Commanche CL to FM 219 FY29SC | Solicitation | Posted | Dec 5, 2028 | β |
| FY29 Seal Coat/Pavement Preservation8 | Solicitation | Posted | Dec 5, 2028 | β |
| FY29 Seal Coat/Pavement Preservation | Solicitation | Posted | Dec 5, 2028 | β |
| FY29 Seal Coat/Pavement Preservation5 | Solicitation | Posted | Dec 5, 2028 | β |
| FY29 Seal Coat/Pavement Preservation11 | Solicitation | Posted | Dec 5, 2028 | β |
| FY29 Seal Coat/Pavement Preservation2 | Solicitation | Posted | Dec 5, 2028 | β |
| Oakland Blvd: E 1st St to E Rosedale | Solicitation | Posted | Sep 15, 2026 | β |
| FY29 Seal Coat/Pavement Preservation16 | Solicitation | Posted | Dec 5, 2028 | β |
| BU 67; from US 67 to Grandbury St | Solicitation | Posted | Feb 2, 2028 | β |
| VA: Various locations Centreport Trl #2 | Solicitation | Posted | Nov 3, 2028 | β |
| SH 180; COOPER ST TO COLLINS/FM 157 | Solicitation | Posted | Nov 3, 2028 | β |
| NCTCOG High Speed Rail FY 28 | Solicitation | Posted | Jan 1, 2028 | β |
| Crowley-Main Street Trail Extension | Solicitation | Posted | Jan 15, 2028 | β |
| FM 1938; From IH 820 to Newman Dr. | Solicitation | Posted | Jan 5, 2028 | β |
| FM 157: AT SIGNET DR. | Solicitation | Posted | Jan 5, 2028 | β |
| FY28 Seal Coat.Pavement.Preservation. | Solicitation | Posted | Dec 1, 2027 | β |
| GREAT SW PKWY AT MARSHALL DR | Solicitation | Posted | Jan 5, 2028 | β |
| FY28 Seal Coat/Pavement Preservation10 | Solicitation | Posted | Dec 1, 2027 | β |
| US 377; From Glenview Dr to Starnes Rd | Solicitation | Posted | Jan 5, 2028 | β |
| Basswood Blvd: Redding Dr to N BlueMound | Solicitation | Posted | Jan 5, 2028 | β |
| BAILEY BOSWELL: AT JARVIS RD | Solicitation | Posted | Jan 5, 2028 | β |
| SH 114; FM 51 S to US 81 | Solicitation | Posted | Jan 5, 2028 | β |
| SH10: AT DICKEY DR. | Solicitation | Posted | Jan 5, 2028 | β |
| S GREAT SW PKWY: AT ARKANSAS LN. | Solicitation | Posted | Jan 5, 2028 | β |
| SH 360; Arkansas Ln to SH 180 | Solicitation | Posted | Sep 2, 2026 | β |
| NCTCOG Air Quality FY 28 | Solicitation | Posted | Jan 1, 2028 | β |
| FY28 Seal Coat/Pavement Preservation9 | Solicitation | Posted | Dec 1, 2027 | β |
| FY28.Seal.Coat Pavement Preservation | Solicitation | Posted | Dec 1, 2027 | β |
| FY28 Seal Coat/Pavement Preservation4 | Solicitation | Posted | Dec 1, 2027 | β |
| FY.28.Seal.Coat Pavement Preservation | Solicitation | Posted | Dec 1, 2027 | β |
| FY..28 Seal Coat Pavement Preservation | Solicitation | Posted | Dec 1, 2027 | β |
| FY28 Seal Coat.Pavement Preservation | Solicitation | Posted | Dec 1, 2027 | β |
| FY28 Seal Coat Pavement Preservation | Solicitation | Posted | Dec 1, 2027 | β |
| FY28 Seal Coat/Pavement Preservation. | Solicitation | Posted | Dec 1, 2027 | β |
| FY.28 Seal Coat Pavement Preservation | Solicitation | Posted | Dec 1, 2027 | β |
| FY28.Seal.Coat.Pavement Preservation | Solicitation | Posted | Dec 1, 2027 | β |
| FY28 SealCoat/Pavement Preservation | Solicitation | Posted | Dec 1, 2027 | β |
| FY28 Seal Coat.Pavement.Preservation | Solicitation | Posted | Dec 1, 2027 | β |
| FY28 Seal Coat/Pavement Preservation7 | Solicitation | Posted | Dec 1, 2027 | β |
| FY28.Seal Coat Pavement Preservation | Solicitation | Posted | Dec 1, 2027 | β |
| FY28 Seal Coat.Pavement Preservation. | Solicitation | Posted | Dec 1, 2027 | β |
| Bomber Spur Trl; Camp Bowie to Vickery | Solicitation | Posted | Jan 2, 2028 | β |
| Park Row Drive Pedestrian Improvements | Solicitation | Posted | Oct 13, 2028 | β |
| FM 1187; Aledo Creeks Rd to Tarrant CoLn | Solicitation | Posted | Oct 4, 2028 | β |
| US 180: AT COOL JCT | Solicitation | Posted | Oct 4, 2028 | β |
| TMC Management 2027 | Solicitation | Posted | Sep 1, 2026 | β |
| AT&T Way: Division to Abram | Solicitation | Posted | Aug 17, 2026 | β |
| North Texas Moves West Non Let | Solicitation | Posted | Aug 9, 2026 | β |
| US 81/287; N of Harmon Rd to N of IH 35W | Solicitation | Posted | Aug 5, 2026 | β |
| NCTCOG Sign & Striping Assessment FY 27 | Solicitation | Posted | Jan 1, 2027 | β |
| HSIP Systemic Median Barrier | Solicitation | Posted | Aug 5, 2026 | β |
| Traffic TCD 2026 | Solicitation | Posted | Aug 5, 2026 | β |
The TxDOT - Fort Worth District is a vital state_agency entity responsible for the planning, design, and maintenance of the stateβs multi-modal transportation infrastructure within its designated regional boundaries. As a key arm of the broader Texas Department of Transportation, the TxDOT - Fort Worth District manages critical highway, bridge, and road systems to ensure safe and efficient travel for the public. This agency plays an essential role in sustaining the growth and connectivity of the region, overseeing significant infrastructure investments that require professional services and construction expertise.
Because of its extensive infrastructure responsibilities, the TxDOT - Fort Worth District frequently procures a wide range of services and supplies, including heavy highway construction, bridge rehabilitation, pavement marking, and traffic signal maintenance. The TxDOT - Fort Worth District also issues solicitations for vegetation management, routine road maintenance, and specialized engineering or consulting services necessary to support its capital improvement projects. Contractors working with the TxDOT - Fort Worth District must possess the technical capabilities and regulatory compliance required for large-scale public works projects.
Contractors can efficiently locate and track current procurement opportunities from the TxDOT - Fort Worth District by utilizing Zabalist, which aggregates active solicitations and project updates in one centralized platform. While the Texas Electronic State Business Daily (ESBD) serves as the official state portal for advertising these opportunities, Zabalist provides the analytical tools and tracking features necessary to stay ahead of the TxDOT - Fort Worth District bidding cycle. By streamlining the search process, Zabalist helps vendors identify, monitor, and bid on relevant TxDOT - Fort Worth District contracts with greater precision and speed.
You can find active opportunities from the TxDOT - Fort Worth District by monitoring the Texas Electronic State Business Daily (ESBD) or by using Zabalist, which simplifies tracking by aggregating these specific solicitations. Zabalist allows you to filter and receive alerts for new projects released by this agency.
The TxDOT - Fort Worth District typically procures services related to heavy highway construction, bridge maintenance, road surfacing, and traffic control operations. They also seek professional engineering services and general construction supplies necessary for regional infrastructure upkeep.
To be eligible for many contracts, vendors must register with the Texas Centralized Master Bidders List (CMBL) maintained by the state. Once registered, you should ensure your profile is aligned with the specific commodity codes relevant to the work performed for the TxDOT - Fort Worth District.