OV | Royal St | Smith Br Rd | FM 2268

50 days agoDue: June 4, 2026

📄Description

Pulverize the existing asphalt, stabilize the remaining base and apply two inch HMAC surface along Royal Street from Smith Branch Rd to FM 2268; install ribbon curb on both sides of the road and sidewalk on one side of the road.

Type of Work: Rehabilitate Existing Roadway

Highway: ROYAL ST

Location: Smith Branch Rd to FM 2268

County: Bell

Working Days: 180.0

Oversight: State

Spec Book Year: 2024.0

🚧TxDOT Project Details

CSJ
0909-36-183
Project ID
A00181805
Highway
ROYAL ST
District
Waco
County
Bell
Type of Work
Rehabilitate Existing Roadway
Classification
Overlay
Project Type
Construction
Sub Type
Roadway
Working Days
180 (Working Days)
Oversight
State
0
Spec Book Year
2024.0
Federal Project #
STP 2023(561)MM
MPO
Killeen-Temple Metropolitan Organization
Project Stage
Ready to Let
Project Limits
Smith Branch Rd to FM 2268

💲Estimated Cost

$1.80M

Engineer's estimate / low bid estimate from TxDOT

Key Details

Solicitation ID
txdot_0909-36-183
Source
TxDOT
Status
Posted
Open for submissions
Category
maintenance
Due Date
June 4, 2026

👤 Contact

Bill Compton

[email protected]

🏛️ Agency

TxDOT - Waco District

🏛️ State Agency

Limestone, TX

Agency #txdot_waco

View agency profile →View all TxDOT - Waco District bids →

View the official TxDOT project data

View on data.texas.gov