Construct a 6 to 16 foot wide concrete shared-use path to improve pedestrian safety on southbound Spur 290 (3rd Street) from Avenue A to Avenue F, install concrete barrier rail and railroad safety fencing on bridge span over BNSF rail lines.
Type of Work: Construct Pedestrian Infrastructure
Highway: SPUR 290
Location: @ BNSF Tracks to @ BNSF Tracks
County: Bell
Working Days: 180.0
Oversight: State
Spec Book Year: 2024.0
$5.52M