Removal of thirteen corroded steel trusses. The existing roof will need to be removed to decommission the corroded steel trusses. Installation of thirteen new steel trusses with an Epoxy Novolac Coating to protect it from water chemical soaps and moisture. The new roof will transition with the existing roof construction aligned with existing parapet walls and maintain a weathertight building envelope.

2910 E 5TH ST, Austin (Travis County)

Building Permit: 4TDLR Project: 1

Source coverage

5 linked records

Explore the filings behind this project.

How these records are linked

Record matching confidence: 75%. This describes the record association, not construction completion.

Reported project value
$293K
About this figure

The value recorded for this linked project. Filings may describe overlapping scopes, so this is not a final invoice or an appraisal.

Reported floor area
Not supplied
About this figure

Floor area associated with the linked project record. Open the source records to inspect each reported scope.

Site area
Not supplied
About this figure

The count or area provided by the linked records. Proposed figures may change as plans are revised.

Last recorded activity
Nov 20, 2026
About this figure

The latest activity date in this linked project record. It does not establish current work at the site.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 6, 2026511 days across supplied datesDec 30, 2027

7 timeline dates shown.

  1. Permit 2026-100761 BP: Removal of thirteen corroded steel trusses. The existing roof will need to be removed to decommission the corroded steel trusses. Installation of thirteen new steel trusses with an Epoxy Novolac Coating to protect it from water chemical soaps and moisture. The new roof will transition with the existing roof construction aligned with existing parapet walls and maintain a weathertight building envelope. · Building Permit · 2026-100761 BP

    Active

    Source: Building Permit · 2026-100761 BP

    View source record
  2. Permit 2026-112554 BP: Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 1 Admin · Building Permit · 2026-112554 BP

    Active

    29 days after the preceding date shown.

    Source: Building Permit · 2026-112554 BP

    View source record
  3. Permit 2026-112767 BP: Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC. 2 FLEET · Building Permit · 2026-112767 BP

    Active

    Same day as the preceding date shown.

    Source: Building Permit · 2026-112767 BP

    View source record
  4. Permit 2026-112777 BP: Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 3 Fuel · Building Permit · 2026-112777 BP

    Active

    Same day as the preceding date shown.

    Source: Building Permit · 2026-112777 BP

    View source record
  5. TDLR Project: CapMetro Facilities Renovation Design - Vehicle Maintenance Building Phase · TDLR Project · TABS2027006448

    Project Registered

    77 days after the preceding date shown.

    Source: TDLR Project · TABS2027006448

    View source record
  6. Construction Start · Scheduled date

    Projected start

    A date supplied in the filing; this does not confirm that work started or finished.

    101 days after the preceding date shown.

    Source: TDLR Project · TABS2027006448

    View source record
Show 1 more dates
  1. Expected Completion · Scheduled date

    Projected completion

    A date supplied in the filing; this does not confirm that work started or finished.

    304 days after the preceding date shown.

    Source: TDLR Project · TABS2027006448

    View source record

Project Metrics

TDLR #TABS2027006448
$293K
Total Value
Started:Aug 6, 2026
Last activity:Nov 20, 2026
Duration:106 days

Location & views

2910 E 5TH ST

Loading location map…
30.25628, -97.70994
Detailed source chronology
2026
Aug 6
4 mos ago
Permit 2026-100761 BP: Removal of thirteen corroded steel trusses. The existing roof will need to be removed to decommission the corroded steel trusses. Installation of thirteen new steel trusses with an Epoxy Novolac Coating to protect it from water chemical soaps and moisture. The new roof will transition with the existing roof construction aligned with existing parapet walls and maintain a weathertight building envelope.
Building Permit • Active
Link confidence: 100%
Open record
August 6, 2026
2026-100761 BP
2026
Sep 4
3 mos ago
Permit 2026-112554 BP: Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 1 Admin
Building Permit • Active
Link confidence: 100%
Open record
September 4, 2026
2026-112554 BP
2026
Sep 4
3 mos ago
Permit 2026-112767 BP: Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC. 2 FLEET
Building Permit • Active
Link confidence: 100%
Open record
September 4, 2026
2026-112767 BP
2026
Sep 4
3 mos ago
Permit 2026-112777 BP: Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 3 Fuel
Building Permit • Active
Link confidence: 100%
Open record
September 4, 2026
2026-112777 BP
2026
Nov 20
3 days ago
TDLR Project: CapMetro Facilities Renovation Design - Vehicle Maintenance Building Phase
TDLR Project • Project Registered
Valuation: $293K
Link confidence: 100%
Open record
November 20, 2026
TABS2027006448
2027
Mar 1
3 mos from now
Construction Start
TDLR Project • Projected start
Work itemCapMetro Facilities Renovation Design - Vehicle Maintenance Building Phase
Start Mar 1, 2027→End Dec 30, 2027
Open record
March 1, 2027
TABS2027006448
2027
Dec 30
1 yr from now
Expected Completion
TDLR Project • Projected completion
Work itemCapMetro Facilities Renovation Design - Vehicle Maintenance Building Phase
Start Mar 1, 2027→End Dec 30, 2027
Open record
December 30, 2027
TABS2027006448

Linked records by source

Building Permits (4)

Public source records
Removal of thirteen corroded steel trusses. The existing roof will need to be removed to decommission the corroded steel trusses. Installation of thirteen new steel trusses with an Epoxy Novolac Coating to protect it from water chemical soaps and moisture. The new roof will transition with the existing roof construction aligned with existing parapet walls and maintain a weathertight building envelope.
Active • Aug 6, 2026
2026-100761 BP
Description: Removal of thirteen corroded steel trusses. The existing roof will need to be removed to decommission the corroded steel trusses. Installation of thirteen new steel trusses with an Epoxy Novolac Coating to protect it from water chemical soaps and moisture. The new roof will transition with the existing roof construction aligned with existing parapet walls and maintain a weathertight building envelope.
Type: Building Permit
Contractor: Unity Contractor Services, Inc
Location: 2910 E 5TH ST
Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 1 Admin
Active • Sep 4, 2026
2026-112554 BP
Description: Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 1 Admin
Type: Building Permit
Contractor: Tryggr Roofing & Construction LLC
Location: 2910 E 5TH ST
Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC. 2 FLEET
Active • Sep 4, 2026
2026-112767 BP
Description: Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC. 2 FLEET
Type: Building Permit
Contractor: Tryggr Roofing & Construction LLC
Location: 2910 E 5TH ST
Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 3 Fuel
Active • Sep 4, 2026
2026-112777 BP
Description: Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 3 Fuel
Type: Building Permit
Contractor: Tryggr Roofing & Construction LLC
Location: 2910 E 5TH ST

TDLR Projects (1)

Public source records
CapMetro Facilities Renovation Design - Vehicle Maintenance Building Phase
Project Registered • Nov 20, 2026
TABS2027006448
Description: Renovation of 3646 sf
Facility: CapMetro Vehicle Maintenance Building
Design firm: McKinney York Architects
Estimated cost: $293K
Sq Ft: 3,646