Public permit record · Austin

FinalCommercialRemodel

Mechanical Permit

#2025-090060 MP

Mechanical Permit - Remodel

7301 METRO CENTER DR UNIT 300, Austin, TX

View official record
Reported valuation
Not supplied
About this figure

The valuation recorded with this permit. This is not the current property value or necessarily the full cost of the overall project.

Issue date
Jul 23, 2025
About this figure

The issue date supplied by the permit record. Issuance does not confirm that work started or finished.

Reported work area
Not supplied
About this figure

The reported new-construction area, or remodel area when new area is absent. Detailed area fields appear below when supplied.

Issuing city
Austin
About this figure

The jurisdiction associated with this permit. Use the official source link for current permit status and local requirements.

The permit record

Permit dates & milestones

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 23, 2025Dates recorded on one dayJul 23, 2025

1 timeline dates shown.

  1. Permit issued · City of Austin Development Services

    Source: City of Austin Development Services

    View source record

Project Description

THE INSTALL OF MECHANICAL ELECTRICAL AND PLUMBING ENGINEERING ASSOCIATED WITH ADDING A DATA CENTER INSIDE THE EXISTING CLIENTS FACILITY. ALL WALLS CEILINGS DOORS ARE EXISTING.

Project Location

Job Site Address

7301 METRO CENTER DR UNIT 300, Austin, TX

Council District:District 2
View on Google Maps

Work Details

Work Class
Remodel
Permit Type
Mechanical Permit
Permit Class
Commercial

Contractor Information

Other permits at this address

59 City of Austin permits on file at this address point, 2014–2026.

IssuedPermitWorkStatus
2026-09-18
2026-108573 BP
Building Permit
Remodel · C-1001 Commercial Finish Out
ePlan: Commercial Expedited Review - [APPROVED] Phase 2- Interior De- Energized Substation Training Facility for Natural Resources company (5000 SF).
Active
2026-09-08
2026-114501 EP
Electrical Permit
Freestanding · Sign Permit
28819 Metcenter 15 Illuminated Monument
Active
2026-09-01
2026-108572 PP
Plumbing Permit
Remodel · C-1001 Commercial Finish Out
ePlan: Commercial Expedited Review - [APPROVED] Phase 1- Interior Remodel with Change of Use With Exterior Stair and Landing (39342 SF).
Active
2026-09-01
2026-108572 MP
Mechanical Permit
Remodel · C-1001 Commercial Finish Out
ePlan: Commercial Expedited Review - [APPROVED] Phase 1- Interior Remodel with Change of Use With Exterior Stair and Landing (39342 SF).
Active
2026-08-27
2026-108572 EP
Electrical Permit
Remodel · C-1001 Commercial Finish Out
ePlan: Commercial Expedited Review - [APPROVED] Phase 1- Interior Remodel with Change of Use With Exterior Stair and Landing (39342 SF).
Active
2026-08-25
2026-108572 BP
Building Permit
Remodel · C-1001 Commercial Finish Out
ePlan: Commercial Expedited Review - [APPROVED] Phase 1- Interior Remodel with Change of Use With Exterior Stair and Landing (39342 SF).
Active
2026-06-08
2026-043912 BP
Building Permit
New · C- 329 Com Structures Other Than Bldg
INSTALL CONCRETE PAD NEW NITRO TANK AND LINES.
Active
2026-06-04
2026-036253 BP
Building Permit
Remodel · C-1000 Commercial Remodel
INSTALL NEW EXHAUST/VENT/DUCT SYSTEM FOR LAB 186/R&D LAB 184.
Active
2026-03-23
2026-007655 PP
Plumbing Permit
Remodel · C-1001 Commercial Finish Out
ePlan: Commercial Expedited Review- First Time Finish out from Warehouse Shell to Office Warehouse (41770 SF)
Final
2026-01-29
2026-007655 EP
Electrical Permit
Remodel · C-1001 Commercial Finish Out
ePlan: Commercial Expedited Review- First Time Finish out from Warehouse Shell to Office Warehouse (41770 SF)
Final
2026-01-21
2026-007655 BP
Building Permit
Remodel · C-1001 Commercial Finish Out
ePlan: Commercial Expedited Review- First Time Finish out from Warehouse Shell to Office Warehouse (41770 SF)
Final
2026-01-21
2026-007655 MP
Mechanical Permit
Remodel · C-1001 Commercial Finish Out
ePlan: Commercial Expedited Review- First Time Finish out from Warehouse Shell to Office Warehouse (41770 SF)
Final
2025-11-05
2025-142243 BP
Building Permit
Interior Demo Non-Structural · C-1000 Commercial Remodel
Interior non structural demolition.
Final
2025-11-04
2025-141672 EP
Electrical Permit
Remodel · C-1000 Commercial Remodel
Add New Electrical Panels (NLD4A NLDA4A2 NLDA4B) and Disconnect for Suite 300
Final
2025-11-04
2025-141672 BP
Building Permit
Remodel · C-1000 Commercial Remodel
Add New Electrical Panels (NLD4A NLDA4A2 NLDA4B) and Disconnect for Suite 300
Final
2025-10-28
2025-133399 EP
Electrical Permit
Remodel · C-1000 Commercial Remodel
Adding an electrical panel (NLF1A1)
Final
2025-10-28
2025-133399 BP
Building Permit
Remodel · C-1000 Commercial Remodel
Adding an electrical panel (NLF1A1)
Final
2025-08-25
2025-096737 BP
Building Permit
Remodel · C-1000 Commercial Remodel
Demising Wall only in previously permitted office/warehouse. No Occupancy Requested
Final
2025-08-25
2025-096755 BP
Building Permit
Remodel · C-1000 Commercial Remodel
Demising Wall only in previously permitted office/warehouse. No Occupancy Requested
Final
2025-08-21
2025-097657 EP
Electrical Permit
Upgrade · Commercial
Electrical service upgrade for new fire pump.
Expired
2025-07-22
2025-090060 EP
Electrical Permit
Remodel · C-1000 Commercial Remodel
THE INSTALL OF MECHANICAL ELECTRICAL AND PLUMBING ENGINEERING ASSOCIATED WITH ADDING A DATA CENTER INSIDE THE EXISTING CLIENTS FACILITY. ALL WALLS CEILINGS DOORS ARE EXISTING.
Final
2025-07-21
2025-090060 BP
Building Permit
Remodel · C-1000 Commercial Remodel
THE INSTALL OF MECHANICAL ELECTRICAL AND PLUMBING ENGINEERING ASSOCIATED WITH ADDING A DATA CENTER INSIDE THE EXISTING CLIENTS FACILITY. ALL WALLS CEILINGS DOORS ARE EXISTING.
Final
2025-06-17
2025-072167 EP
Electrical Permit
Remodel · C-1000 Commercial Remodel
ADDITION OF MECHANICAL AND ELECTRICAL ENGINEERING ASSOCIATED WITH ADJUSTMENTS MADE TO POWER AND CHILLED WATER DISTRIBUTION. ALL WALLS CEILINGS DOORS ARE EXISTING.
Final
2025-06-13
2025-072167 BP
Building Permit
Remodel · C-1000 Commercial Remodel
ADDITION OF MECHANICAL AND ELECTRICAL ENGINEERING ASSOCIATED WITH ADJUSTMENTS MADE TO POWER AND CHILLED WATER DISTRIBUTION. ALL WALLS CEILINGS DOORS ARE EXISTING.
Final
2025-05-20
2025-051400 EP
Electrical Permit
Upgrade · Commercial
Connecting owner equipment to existing circuits and Panels per Hyatt Dunn. Phase 1 & 2 - 2024 132183 EP & 2024 132184 EP
Final

Showing the 25 most recent of 59.

Source: City of Austin issued construction permits (1980 onward).